My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:15:44 AM
Creation date
4/23/2024 1:41:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7. 2. <br /> Meeting Date: 04/23/2024 <br /> By: Mark Riverblood, Engineering/Public Works <br /> Information <br /> Title: <br /> Adopt Resolution#24-121 Establishing a $370,140 Budget and Approving the Playground Installation for The <br /> Hollow <br /> Purpose/Background: <br /> A 243 lot residential subdivision was approved by the City in 2021 entitled Riverstone South and is generally <br /> south of Hwy's#10 © and north of the Bowers Drive residential area. As part of the planning process in <br /> 2020-21 it was determined that Park Dedication for the new plat would consist of one acre for a neighborhood <br /> park, and$350,000 in cash for the park's development. <br /> The purpose of this case is to formally approve the park development budget for the park, and specifically <br /> authorize the installation of a large and unique playground consistent with the Park&Recreation Commission's <br /> recommendation on April 11 th, 2024. <br /> Notification: <br /> Substantial public engagement,workshops and Public Hearings occurred in 2020 and 2021 leading up to the plat's <br /> approval, and the dedication of the park. <br /> Observations/Alternatives: <br /> One of the stated goals for the park in this location was to preserve the existing trees and then to incorporate the <br /> trees with the playground elements. The approved concept plan is the result of considerable planning to achieve <br /> these goals and to remain within reach of the $350,000 park development budget. On April 1 st, 2024 the Lump <br /> Sum Proposals were due to the city for all the wooden platforms,bridge and elevated boardwalks that the <br /> playground elements would be attached to, or interact with. The 3 00'+feet of boardwalk elements with <br /> installation is $13 8,200. The play equipment components to be attached to the boardwalk are available from the <br /> State Bid Contract and are $3 8,705 including shipping and freight. These components will be purchased by the <br /> City directly,with the boardwalk contractor attaching and integrating them into the larger elevated boardwalk <br /> platforms. The zip line is one of these components that was available from the State Contract, and was installed <br /> last Summer($24,949). <br /> The detailed budget is attachment 5 and includes all the amenities that will be created at the park if Resolution <br /> #24-121 is adopted. Additional information will be presented at the meeting. <br /> Funding Source: <br /> The primary funding source is the $350,000 in Park Dedication fees paid by the Developer of the residential <br /> subdivision. <br /> Recommendation: <br /> The Park&Recreation Commission and Staff recommend proceeding with the construction of the <br /> playground and other amenities at The Hollow as described in this case. <br /> Action: <br />
The URL can be used to link to this page
Your browser does not support the video tag.