Laserfiche WebLink
2.3. Contractor shall rough in mechanicals according to mechanical rough in drawing <br /> provided by building manufacturer. Mechanicals shall be terminated at top of <br /> foundation. Final mechanical connections shall be done by contractor including floor <br /> drains. <br /> 2.4. Contractor will perform initial startup of building using 0 & M manual as a reference. <br /> Contractor will also perform any troubleshooting during initial startup. <br /> HUFFCUTT4154 123rd St. Chippewa HUF CUTT.1COM 729 1 715-723-7446 <br />