Laserfiche WebLink
THE HOLLOW - one-acre park <br /> Proposed budget April 2024 <br /> Restroom Building <br /> Prefabricated,delivered and installed $ 80,000 <br /> Boardwalk <br /> Ramps 300 l.f. <br /> Landings 9-6' x 6' 138,200 <br /> Bridge 1 -6'x 12' <br /> Wood Stairs/ Ladders <br /> Concrete <br /> Walks and Plazas 2,000 s.f. @$10/s.f. 20,000 <br /> Flat Curb at Sitting Circle 500 s.f. @$10/s.f. 5,000 <br /> Play Surface <br /> Wood Fiber 12" depth 3,500 s.f. @$4/s.f. 14,000 <br /> Soft Trails <br /> Crushed stone 6" depth 4,000 s.f. @$3/s.f. 12,000 <br /> Play Features <br /> Combination of catalog pieces and on-site fabrication including <br /> slides,net climbers,swings etc. 39,000 <br /> Zip Line 24,940 <br /> PVC Pipe (crawl-thru faux log tunnel) 2 @$500 each installed 11000 <br /> Interactive Interpretive/Educational Panels 15,000 <br /> Furniture (catalog selections) <br /> 6 Benches and 4 Picnic Tables 5,000 <br /> Landscape Materials <br /> New Trees,screen(hedge) and Prairie/Bee Lawn Seeding 10,000 <br /> Park Lighting(ambient light from street lights and surrounding home sites) -- <br /> Contingency 6,000 <br /> TOTAL COST $370J40 <br />