My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON 7533 Sunw©od ©rive NW <br /> Suite 206 <br /> & ,MEN Ramsey, MN 55303-5119 <br /> Real People. Real Solutions. Ph: (763) 433-2851 <br /> Fax: (763) 427-0833 <br /> Bolton-Menk.com <br /> April 3, 2024 <br /> Mr. Bruce Westby, P.E. <br /> City Engineer/ Director of Public Works <br /> City of Ramsey <br /> 7550 Sunwood Drive NW <br /> Ramsey, Minnesota 55303 <br /> RE: Proposal for Record Drawing Related Services—Ramsey Gateway US HWY 10/169 <br /> Improvements & US HWY 10/169 Temporary Widening <br /> Dear Mr. Westby: <br /> We appreciate the opportunity to present this scope of services for the above projects. Our scope and <br /> fees were prepared based on our understanding of the project and our previous experience in assisting <br /> the City of Ramsey with surveying services. <br /> Our proposed services will be as described below: <br /> As-Built Survey and Record Drawings—Survey key project components after completion of <br /> construction, prepare manhole inventories, and complete Record Drawings. The Temporary Widening <br /> Project includes approximately 16 watermain valves and hydrants and 4 sanitary sewer manholes.The <br /> Ramsey Gateway Interchange Project includes approximately 60 watermain valves and hydrants and 16 <br /> sanitary sewer manholes. <br /> The Temporary Widening project is complete, survey can begin immediately after authorization.The <br /> Ramsey Gateway Project construction is planned for 2024 and 2025. A Record Drawing will be prepared <br /> for each project and include only the applicable city utility plan sheets from the larger overall <br /> construction plans. <br /> We have attached a fee spreadsheet depicting hours, rates, and total compensation on a per task basis. <br /> Our proposed Not-To-Exceed fees for the work are $23,742.00 <br /> If there are any questions related to this proposal, please call me at (651) 968-7760. <br /> Sincerely, <br /> Bolton & Menk, Inc. <br /> r* y <br /> J <br /> f <br /> Kevin P. Kielb, P.E. <br /> Principal Engineer <br /> ATTACHMENT— Fee Spreadsheet <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.