My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park Dedication <br /> requirements with the plat of Lightbridge Academy, as noted in Resolution#24-039, approving the <br /> Preliminary Plat and Final Plat for Lightbridge Academy. The PERMITTEE must pay $10,812 <br /> (park dedication)and$2,756(trail development). These amounts are based off 2.12 acres at$5,100 <br /> per acre(park dedication) and$1,3 00 per acre(trail development). <br /> 13. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br /> applicable Sanitary Sewer Trunk Fee requirements for the plat of Lightbridge Academy. The <br /> PERMITTEE must pay a Sanitary Sewer Trunk Fee of$8,614.00 (2.12 acres x $4,063.00 per <br /> acre). The PERMITTEE acknowledges that these fees are estimates. The rate in effect when the <br /> Plat is recorded will be collected. <br /> 14. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable <br /> Water Trunk Fee requirements with the plat of Lightbridge Academy. The PERMITTEE must <br /> pay a Water Trunk Fee of $15,567.00 (2.12 acres x $7,343.00 per acre). The PERMITTEE <br /> acknowledges that these fees are estimates. The rate in effect when the Plat is recorded will be <br /> collected. <br /> SECTION II <br /> PERMITS AND OCCUPANCY <br /> 15. Requirements for Building Permit. <br /> a. No building permit shall be issued until the PERMITTEE has: (a) installed a Class 5 driving <br /> surface to within 300 feet of the structure; (b) provided the CITY Building Official with a <br /> Certificate of Survey;(c)the financial guaranty described in Section I Paragraph 8 to the CITY; <br /> and (d) obtained all necessary permits from the Lower Rum River Watershed Management <br /> Organization and has provided a copy of such permit to the CITY, if applicable; and <br /> b. No occupancy permit shall be issued until the PERMITTEE has: (a) constructed vehicular <br /> access to the lot, including the installation of at least one layer of bituminous surfacing; and(b) <br /> constructed all utilities and storm water facilities this Agreement requires to serve the lot and <br /> such utilities and storm water facilities are in place, operational and accepted by the CITY. <br /> SECTION III <br /> ON-SITE LANDSCAPING <br /> 16. Maintenance Guaranty for Landscaping. It is herein agreed that the PERMITTEE shall <br /> provide a maintenance guaranty to ensure the survival of the plantings. Said maintenance guaranty <br /> shall consist of cash or an irrevocable letter of credit, approved as to form by the CITY, in the <br /> amount of Three Thousand Three Hundred Eight Dollars and No Cents ($3,308.00) [# <br /> plantings (24 trees and 51 shrubs) x cost/planting ($300/tree and $75/shrub) x 30% average non- <br /> survival rate], which shall be in effect for a two (2) year period commencing on the date of the <br /> CITY's written acceptance of said plantings as part of the Required Improvements. <br /> At the end of the two(2)year period,the PERMITTEE shall contact the CITY to schedule a final <br /> inspection of the landscaping. The determination that all plantings that have been planted in <br /> accordance with the Plans have either survived or have been replaced shall be made by the CITY. <br /> Upon approval of the final landscape inspection by the CITY, the maintenance guaranty shall be <br /> returned to the PERMITTEE. In the event the PERMITTEE fails to maintain the required <br /> plantings for a two (2) year period, the City Council may order the replacement of plantings with <br /> LB Ramsey MN Owner,LLC/Lightbridge Academy <br /> Development Agreement <br /> Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.