My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:14:25 AM
Creation date
4/23/2024 3:41:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr <br /> 44tv V'PrAVITLE ERE TIDIZ!C <br /> 7309 Lake Drive Lino Lakes Mn 55014 <br /> Ph: 651-405-9050 1 Fx: 651-405-9057 <br /> www.baldeagleerectors.com <br /> PROPOSAL <br /> DATE: March 13, 2024 <br /> JOB NAME: CO 12 Filter Slab Modifications <br /> BALD EAGLE ERECTORS,INC.proposes to furnish labor only on the above noted project as follows: <br /> To Install concrete rebar for the unit price of$786.00 per ton per installed qty. <br /> To Install welded wire fabric for the unit price of$00.30 per square foot. <br /> This price is based on regular 8-hour days and it does not include a performance bond. <br /> Excludes: <br /> Orientation,badging or security screening. <br /> BIM related project management and 3D modeling. <br /> Clarifications: <br /> Hoisting equipment and operator for both unloading and placing of rebar as needed by others. <br /> Hoisting equipment must be able to operate in a timely fashion for this price throughout project. <br /> This bid does not include any overtime. <br /> Please note our"normal"exclusions apply to this job,they are no rock anchor installation,no excessive cutting,no <br /> fabricating,no drilling and grouting,no welding of rebar and no installation of masonry rebar.All materials <br /> furnished by others. Scheduled overtime by general contractor will be discussed prior to proceeding. <br /> Line and grade and templates to be supplied by others as needed.All exclusions are at no cost to this erector <br /> AISC Certified Erector <br /> Veteran Owned and TBG <br /> MNUCP Certified DBE/MBE <br /> Certified CERT MBE/SBE Cities of Minneapolis and St.Paul/Hennepin and Ramsey Counties <br /> Certified Member-NMSDC <br /> We hereby propose to furnish labor only-complete in accordance with the above specifications,with payments to be made as <br /> follows: <br /> PROGRESS PAYMENTS/NET 30 DAYS FROM DATE OF INVOICE <br /> All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above <br /> specifications involving extra costs,will be executed only upon written orders,and will beco=opti <br /> charge over and above <br /> the estimate. All agreements contingent upon strikes,accident or delays beyond our control <br /> 7 <br /> This proposal is subject to acceptance within 30 days and is void thereafter at of the undersigned. <br /> Authorized Signa e: <br /> ReZ67e94otte <br /> The above price,specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment <br /> will be made as outlined above. <br /> ACCEPTED: <br /> Signature <br /> Date: Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.