Laserfiche WebLink
AGN� C O N S T R U C T IO N Proposal <br /> r� COMMERCIAL 5 INDUSTRIAL CONTRACTORS <br /> 1401 Park Road - Chanhassen, MN 55317 <br /> www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br /> SEND TO <br /> Company name From <br /> AE2S Noah Pundsack <br /> Attention Date <br /> Mr. Ryan Hanson 2/23/2024 <br /> E-mail Phone Magney Proposal# 18 <br /> Ryan.Hanson ae2s.com (612)220-0154 Electrical Conduit Encasement-T& M <br /> F1Urgent F1 Please comment Fx Please review � For your information <br /> Total pages,including cover. 3 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant- Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is seeking compensation for additional labor, material, and equipment required to <br /> complete the changes requested onsite by Mr. Ryan Hanson, w/AE2S on 02/05/2024. The requested <br /> change included encasing recently installed conduits in concrete, in lieu of the specified sand backfill. We <br /> completed this work on a Time and Material basis , as directed. Please see attached supporting <br /> documentation, including work orders and invoices. The costs associated with this change are summarized <br /> below. <br /> Labor: Excavate Previously Backfilled Area & Placing Concrete $1,646.19 <br /> Material: 16 Cubic Yards Concrete (AVR/AME Invoice- see attached) $ 23622.42 <br /> Equipment: Skid Loader(2 Hours) (including fuel & maintenance) $ 183.72 <br /> Equipment: Misc. Small Tools and Equipment(10% of Labor) $ 164.62 <br /> Subcontractor: <br /> Subtotal $4,616.95 <br /> General Contractor's Overhead $ 692.54 <br /> Bond & Insurance premiums $ 79.64 <br /> Lump Sum Total: $ 59389.13 <br /> Additional Calendar Days Required for this Change (Including material lead time): 0.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> Nouli Pandgac4 <br /> Noah Pundsack <br /> Project Engineer Accepted By Date <br /> Page 1 of 772 <br />