Laserfiche WebLink
j 1 9 <br /> nr S <br /> 17?1 <br /> Request For Proposal No. 012 <br /> Date of Issuance: 2/23/2024 <br /> Project Manager: Aaron Vollmer, P.E. <br /> AE2S <br /> Water Tower Place Ste 184 <br /> 6901 E. Fish Lake Road <br /> Maple Grove, MN 55369 <br /> Contractor: Magney Construction Inc. <br /> Project: Ramsey Water Treatment Plant <br /> Owner: City of Ramsey, Minnesota <br /> Re: Filter Slab Modifications <br /> Please submit a cost proposal for changes to the Contract Documents for the following <br /> proposed modifications. THIS IS NOT A WORK CHANGE DIRECTIVE, CHANGE <br /> ORDER, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE <br /> PROPOSED MODIFICATIONS. <br /> Description: <br /> AE2S requests pricing from Magney for changes to the filter slab and CIP supports <br /> beams in the clearwell and backwash reclaim tank. Changes include but are not limited <br /> to extending the filter slab at elevation 1131, increasing the slab thickness to 20" and <br /> increasing the CIP beams in the clearwell and backwash tank from 24" to 52". We also <br /> request pricing for raising the height of the gullet wall and filter trough to 121'-11". See <br /> attached drawings for any additional changes required. Once approved, Contractor will <br /> need to resubmit submittal 135— Concrete reinforcement WTP structural slab, based on <br /> provided drawings. See sheets S203, S301, S3025 S303, S305, S5045 S505 and S601 <br /> attached. <br />