My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/12/2012
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2012
>
Agenda - Planning Commission - 07/12/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:11:28 AM
Creation date
4/25/2024 2:02:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/12/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comparison to former Ramsey Town Center Master Plan <br />Although the revised plan does not impact the City's System Statement in terms of growth forecasts, it <br />does represent a change to the conceptual site plan to illustrate the potential for future development. <br />The City of Ramsey is not requesting an amendment to the approved forecasts for ultimate build -out of <br />the development. The City is requesting to replace the original Site Plan from the Ramsey Town Center <br />Master Plan and amendment to the Design Framework (original Design Guidelines). <br />The revised Development Plan is a marketing tool to illustrate what development may look like through <br />2030. The site plan illustrates that the original forecasts can be achieved with the revised site plan <br />through high floor area ratios, densities, and shared parking within the TOD Area. <br />The Vision <br />The revised Development Plan maintains much of the original vision for a transit -oriented, pedestrian - <br />scale development, now refocused in the center. <br />Transit Village <br />The area immediately surrounding the Ramsey Station is commonly referred to as Transit Village. It <br />currently includes the Ramsey Municipal Center, Municipal Parking Ramp, the VA Outpatient Clinic, and <br />the Ramsey Office Plaza. Currently under construction is the Residence at The COR, a 230-unit <br />apartment complex. <br />Office Park <br />The office park remains unchanged from the original plan. Currently completed are the PACT Charter <br />School, NAU Country Insurance, Allina Medical Clinic, and the Midwest Medical Examiner. <br />There are several projects completed and under construction, totaling nearly 300 existing units. Within <br />the original 322 acre boundary, nearly 1,900 housing units are forecasted. Floor Area Ratios and <br />structured parking requirements will allow the City to exceed this forecast beyond the current planning <br />period. With the clarified boundary, the original 2,500 household forecast is met or exceeded within the <br />current planning period. <br />West Retail Area <br />The previous Master Plan did include medium -to -large scale retail on the western edge of the <br />development. As part of the re -visioning process, the City determined that a solid anchor was necessary <br />to support the desired land use within the TOD Area. The expanded large-scale retail anchor lies largely <br />outside the TOD Area, and additional residential units within the TOD area have been added to off -set <br />the shift in land uses. <br />City of Ramsey Comprehensive Plan Amendment -The COR Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.