My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 11/07/2013
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2013
>
Agenda - Planning Commission - 11/07/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:18:35 AM
Creation date
4/25/2024 2:18:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
11/07/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: ALPINE WOODS THIRD ADDITION <br />Sketch Plan Minor Plat Request <br />November 1, 2013 <br />Page 3 of 3 <br />The Applicant shall prepare a landscape plan that provides at least eight (8) overstory trees, eight (8) <br />evergreen trees, and eight (8) understory trees along the northern property boundary. Minimum plant <br />sizes for transitioning purposes shall be: 2.5 inch caliper for overstory trees, six (6) feet in height for <br />evergreen trees, and 1.5 inch caliper for understory trees. <br />Easements: With the Final Plat Application, Staff will be reviewing compliance with the standard <br />requirements for drainage and utility easement dedication. Drainage and utility easements must be ten <br />(10) feet in width abutting dedicated right-of-way, five (5) feet in width along both side and rear lot <br />lines, and encumber any 100-year flood zone for all existing and proposed surface waters and wetlands. <br />The existing easement for the temporary cul-de-sac will need to be vacated through an Application for <br />Easement Vacation. The preferred alternative for replacement of the existing cul-de-sac will also need <br />to be dedicated to the City. <br />Utilities: Municipal Water and Sanitary Sewer have been extended to the site. The Applicant will be <br />responsible for applicable connection fees to be outlined during the Final Plat Review. <br />Other Development Fees. The Applicant will also be responsible for Park Dedication, Trail <br />Development, and Stormwater Management Fees. A full analysis of applicable development fees will <br />be provided with the Final Plat Review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.