Laserfiche WebLink
PERSONNEL!COMPLEMENT <br /> Public Works Superintendent 1.00 1.00 1.00 1.00 1.00 <br /> Secretary(Formerly under Engineering) 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Mechanic 2.00 2.00 2.00 2.00 2.00 3,00 <br /> Street Supervisor - - - 1.00 -.1.00 1.00 <br /> Streets Lead Worker 1.00 1.00 1.00 1.00 1.00 1.00 <br /> PW Maintenance Worker 5.00 5.00 5.00 5.00 5.00 8.00 <br /> Temporary-Streets 0.50 0.50 0.50 0.50 -0.50 0.50 <br /> Street Maintenance Total 10.50 10.50 10.50 11.50 11.50 14.50 <br /> 6488/6489 Other Contracted Services <br /> Pavement Management Program Funding(Transfer to Pavement Management Fund) 260,742 300,000 - - - <br /> Cracksealing/Rejuvenation/Pothole Patching 237,483 2391258 162,784 200,000 5751000 555,000 <br /> Curb Repair/Tree Removal - - 15,000 15,000 20,00❑ <br /> 237,483 500,000 462,784 215,000 590,000 575,000 <br /> 6540-Heavy Machinery <br /> F350 truck with plow(2021&2022 total cost) - - 116,891 103,199 <br /> 1-Ton Truck - - <br /> 2-Single Axis Plow Trucks 148,292 544,318 <br /> Tractor Backhoe($84,000 total remainder utility funded) 37,688 <br /> Tandem Axle Truck with Plow - - 298,750 <br /> 721 G Front End Loader 226,000 <br /> 185,980 116,891 103,199 298,750 770,318_ <br /> 6550-Motor Vehicle <br /> I-ton truck 62)772 <br /> 2-3/4 ton trucks with plows(1 new&I replacement) - 133,852 <br /> F550 4x4 Truck with 9'2"V-p I ow[New)with I ift gate 1091000 <br /> F350 44 with utility box and 92"Boss V-Plow Sign truck <br /> 62,772 133,852 109,00❑ <br /> 6580-Other Equipment <br /> Sidewalk Machine - 162,723 <br /> Snow Pusher Box for Front End Loader 18,855 <br /> Trailer for skidsteer - 15,102 <br /> Toolcat 36,105 <br /> Skidsteer - - 57,372 <br /> Tire balancer(1/2 cost other 1/2 police) 9)453 <br /> Asphalt floater 14,405 <br /> ATV Athletic Field Maintenance Machine 14,032 - - <br /> Hydraulic hose Crimping Machine <br /> Trailer Mounted Boom Lift 58,000 <br /> Bobcat T66 Skidsteer 81,000 <br /> Scissor Lift J LG 2646 26,500 <br /> 10-Foot Slide in Removable Salt/Sander Spreader(Truck Mounted} 14,000 <br /> Hydraulic hose Crimping Machine 15,000 <br /> 14,032 271,302 23,858 18,855 194,500 <br /> DESCRIPTION OF SERVII10S,: <br /> The Street Maintenance Department is responsible for maintaining city streets,sidewalks,traffic signs, <br /> boulevards,ROW mowing and the storm water collection system. <br /> BUDGET HIGHLIGHTS <br /> • Street Maintenance Worker-New Full Time-Start 2-5-24-$66,125)(6102-6133) <br /> • Street Maintenance Worker-New Full Time-Start 2-5-24-$66,125)(6102-6133) <br /> • Street Maintenance Worker-New Full Time-Start 3-4-24-$60,219(6102-6133) <br /> • Mechanic-New Full Time-Start 3-4-24-$65,420(6102-6133) <br /> • PW Building Repairs(1/3 share)-$21,670(6381) <br /> • Contract Services Pothole Patching-$500,000(6488-6489) <br /> • Spray Patching-ARPA funds of$375,000 spent in 2023(6489-6489) <br /> • 2-Single Axle Plow Trucks(CC Authorized 1-24-23)-$544,318 <br /> • Additional Capital Requests(See listing above)-$529,500(6540-6580)(Capital Equip Debt) <br /> -47- <br />