Laserfiche WebLink
PERSONNEL COMPLEMENT <br /> Public Works Superintendent 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Secretary(Formerly under Engineering) 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Mechanic 2.00 2.00 2.00 2.00 2.00 2.00 <br /> Street Supervisor - - - - 1.00 1.00 <br /> Streets Lead Worker 1.00 1.00 1.00 1.00 1.00 1.00 <br /> PW Maintenance Worker 4.00 5.00 5.00 5.00 5.00 5.00 <br /> Temporary-Streets 0.50 0.50 0.50 0.50 0.50 0.50 <br /> Street Maintenance Total 9.50 10.50 10.50 10.50 11.50 11.50 <br /> 6488/6489 Other Contracted Services <br /> Pavement Management Program Funding(Transfer to Pavement Management Fund) 260,742 300,000 - - <br /> Cracksealing/Rejuvenation/Spray Patching 237,483 237,483 239,258 162,784 200,000 200,000 <br /> Spray Patching - - - - - 375,000 <br /> Curb Repair/Tree Removal - - 15,000 15,000 <br /> 237,483 237,483 500,000 462,784 215,000 590,000 <br /> 6540-Heavy Machinery_ <br /> F350 truck with plow 197,061 116,891 <br /> 1-Ton Truck 37,577 - - <br /> Sidewalk Machine 148,292 <br /> Tractor Backhoe($84,000 total remainder utility funded) 37,688 <br /> Tandem Axle Truck with Plow - - - 265,800 298,750 <br /> 234,638 185,980 116,891 265,800 298,750 <br /> 6550-Motor Vehicle <br /> 1-ton truck 62,772 <br /> -2-3/4 ton trucks with plows(I new&I replacement) - 133,852 <br /> 62,772 133,852 <br /> 6580-Other Equiernent <br /> Sidewalk Machine 162,723 <br /> Snow Pusher Box for Front End Loader 18,855 <br /> Trailer for skidsteer 15,102 <br /> Toolcat 36,105 - <br /> Skidsteer 57,372 <br /> ATV Athletic Field Maintenance Machine 14,032 14,032 - <br /> 14,032 14,032 271,302 18,855 <br /> DESCRIPTION OF SERVICES: <br /> The Street Maintenance Department is responsible for maintaining city streets,sidewalks,traffic signs,boulevards,ROW <br /> mowing and the storm water collection system. <br /> BUDGET HIGHLIGHTS <br /> • Additional street maintenance worker added in 2022,not included in 2022 budget-$74,310-2023 exp <br /> (Coded under departments,260,311,312) <br /> • PW Superintendent position not refilled <br /> City Engr/PW Direction Salary% <br /> • Additional Spray Patching-2 Year Funding from ARPA Funds-$375,000 Each Year <br /> • New Snow Pusher Box for Front-end loader-$18,855 <br /> New 3/4 ton pick-up with plow equipment-$58,542 <br /> • Replace 3/4 pickup with dump&plow-$75,310 <br /> • Replace tandem dump with plow-$270,950 <br /> GOALS OF CURRENT YEAR BUDGET: <br /> Maintain and improve city's rating of 7.0 average of road condition <br /> Increase use of contracted services on pothole repair(velocity patching) <br /> Increase prevenative maintenace to prolong the life of our public streets <br /> Maintain our city vehicles and equipment to the highest level possible <br /> 7- <br /> Performance Measurements: <br /> 2018 Actual 2019 Actual 2020 Actual 2021 Actual 2022 Projected 2023 Projected, <br /> Actual <br /> Crack filling(miles) 7.95 21.5 7 20.88 10.37 is <br /> Sealcoating(miles) 7.5 0 0 0 0 0 <br /> jAsphalt patching(tons) ISO 532 Soo <br /> _53- <br />