My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 04/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:38 AM
Creation date
5/6/2024 8:54:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br />1.1 Project Description <br />The City of Ramsey in conjunction with their civil engineering consultants, Hakanson Anderson, <br />is preparing to complete roadway improvements within four areas of the city during the 2024 <br />construction season. The street improvements well be completed under 2 separate city project <br />numbers, IP 24-03 and IP 24-05. City Project IP 24-03 will include residential street within 3 areas <br />of the city and City Project IP 24-05 will consist of resurfacing Xkimo Street. <br />To aid in preparing design and construction documents, Hakanson Anderson, on behalf of the <br />city, solicited bids to perform a geotechnical exploration for each project. Haugo GeoTechnical <br />Services (HGTS), was the successful bidder for both projects. This report presents the results of <br />the 24 soil borings advanced along the various roadway alignments within the IP 24-03 Street <br />Reconstruction areas. <br />1.2 Purpose <br />The purpose of this geotechnical exploration was to determine existing bituminous pavement <br />section thicknesses, characterize subsurface soil and groundwater conditions and provide <br />recommendations for roadway design and construction. <br />1.3 Site Description <br />The streets slated for reconstruction/improvements under City Project IP-24-03; <br />• Vanadium Street between Green Valley Road and 18011, Lane <br />• 178th Lane NW from about 300 feet west of Vanadium Street to Uranium Street <br />• 180th Lane NW between Vanadium Street and Uranium Street <br />• Uranium Street from about 150 feet north of 180th Lane NW to 178th Lane NW <br />• 179th Lane NW from Uranium Street to about 300 feet east <br />• 177th Lane NW from Vanadium Street to end <br />• Waco Street from 179th Lane NW to north end of Waco Drive <br />• Waco Drive <br />• 1801h Avenue NW from Barium Street to about 300 feet east <br />• Barium Street NW from 179th Lane to end <br />• 180th Avenue NW from Barium Street to end <br />Each street is a 2-lane bituminous surfaced roadway that provides access to single family homes. <br />Each of the streets slated for improvement was noted to contain numerous cracks, both <br />longitudinal and transverse cracks as well as some "alligator" cracking. We also observed several <br />patched areas. <br />The roadway/pavement surface was relatively level but varied along the alignments and varied <br />between the different areas within the city. Overall, ground surface elevations at the boring <br />location ranged from about 880 to 908 feet above mean sea level. <br />
The URL can be used to link to this page
Your browser does not support the video tag.