My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 04/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:38 AM
Creation date
5/6/2024 8:54:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Full plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to <br />prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the plan sheet <br />showing the typical sections, which includes information on the proposed pavement sections. Plans are available <br />upon request from the City Engineer. <br />Notification: <br />Notification is not required for this case. <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff anticipates this case will take approximately 15 minutes to present and respond to questions. <br />Observations: <br />The Basalt Street construction is proposed to be bid as an alternate. <br />Alternatives: <br />Alternative #1: Motion to recommend City Council approve plans and specifications and authorize advertisement <br />for bids for 2024 Neighborhood Pavement Overlay Improvements, Improvement Project #24-07. <br />Alternative #2: Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management (PM) Funds, Stormwater Utility <br />Funds and Sanitary Sewer Utility Funds. The alternative Basalt Street construction does not qualify for Pavement <br />Management Funds, funding would likely be Public Improvement Revolving (PIR) Funds. <br />The City collected a $10,000 Road Improvement Fee as part of the Garden View development in 2019, to be used <br />towards a future pavement mill and overlay of 14-flh Lane (Seasons of Ramsey segment). This was due to the <br />significant street patches within 147th Lane required for water and sewer connections as part of the development. <br />The estimated costs below include 14-percent indirect costs for administrative, engineering, finance, and legal <br />costs. <br />• Base Street project costs $1,452,946.74 <br />• Alt Bid Street project costs $93,264.28 <br />o Basalt Street <br />• Base Stormwater project costs <br />$146,068.20 <br />• Base Sanitary Sewer project costs <br />$6,156.00 <br />• Alt Bid Sanitary Sewer project costs <br />$570.00 <br />o Basalt Street <br />• Total Project Costs <br />$1,699,005.22 <br />Recommendation: <br />Staff recommends alternative #1. <br />Outcome/Action: <br />Motion to recommend City Council approve plans and specifications and authorize advertisement for bids for <br />2024 Neighborhood Pavement Overlay Improvements, Improvement Project #24-07. <br />
The URL can be used to link to this page
Your browser does not support the video tag.