My WebLink
|
Help
|
About
|
Sign Out
Home
FINAL 2020 GENERAL FUND BUDGET
Ramsey
>
Finance
>
General Fund Budget
>
2020
>
FINAL 2020 GENERAL FUND BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2024 1:57:11 PM
Creation date
5/9/2024 1:56:43 PM
Metadata
Fields
Template:
Finance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FUND GENERAL DEPARTMENT: TRAFFIC ENGINEERING <br /> FUNCTION: PUBLIC SAFETY <br /> Business Object 2020 <br /> Unit Account Description 2017 2018 2019 Adopted <br /> Actual Actual Adopted Budget Budget <br /> 0260 6102 F.T.REGULAR-WAGES&SALARIES 29,811 24,461 48,981 57,170 <br /> 0260 6103 FULL TIME-REGULAR-OVERTIME - - <br /> 0260 6105 TEMPORARY-WAGES&SALARIES 140 - <br /> 0260 6121 PERA CONTRIBUTIONS 1,388 1,878 3,674 4,288 <br /> 0260 6122 FICA/MEDICARE CONTRIBUTIONS 2,954 1,845 3,747 4,374 <br /> 0260 6133 WORKERS COMP INSURANCE PREMIUM 1,708 1,790 3,476 4,254 <br /> 0260 6249 MISCELLANEOUS OPERATING SUPPLY 10,120 21,921 15,000 15,000 <br /> 0260 6271 SIGN REPAIR MATERIALS 712 - 3,000 3,000 <br /> 0260 6361 GENERAL LIABILITY/PROPERTY INS 668 1,081 750 1,200 <br /> 0260 6371 ELECTRIC UTILITIES 12,546 12,261 13,000 13,000 <br /> 0260 6382 MACHINERY&EQUIPMENT REPAIR 7,228 20,422 13,000 20,000 <br /> 0260 16489 CONTRACTED SERVICES 395 300 3,500 3,500 <br /> 0260 16580 OTHER EQUIPMENT - 38,556 <br /> Total Expenditure 67,670 124,516 108,128 125,786 <br /> DESCRIPTION OF SERVICES: <br /> The Traffic Engineering budget funds the installation and maintenance of traffic signage on,above,and/or near city streets. <br /> BUDGET HIGHLIGHTS <br /> • No major changes. Staff time redistributed between streets,traffic engr&snow plowing <br /> GOALS OF CURRENT YEAR BUDGET: <br /> •Continue to meet FHWA guidelines for traffic signage <br /> •Replace damaged or defective signs within 48 hours <br /> •Bring signage up to current standards on all reconstruct and overlay projects <br /> •Continue to support Engineering and Community Development departments with traffic issues <br /> Performance Measurements: <br /> 2017 Actual 2018 Estimate 2019 Projected <br /> Total Hours 650 610 610 <br /> Number of Traffic Signs in System 2360 2390 2390 <br /> Number of Traffic Counts Performed 90 15 15 <br /> -43- <br />
The URL can be used to link to this page
Your browser does not support the video tag.