My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 05/09/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 05/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:35:21 AM
Creation date
5/9/2024 4:29:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
05/09/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
away). <br /> Pedestrian Connections <br /> All the internal roadways will have a sidewalk on one side of the street per City standards. The site is within the <br /> required walking distance of Brookside Elementary School. A cut-through walkway is proposed to provide a <br /> direct pedestrian connection to the school. The applicant is working with the School District on construction <br /> logistics. <br /> No pedestrian connection is shown to Nowthen Boulevard,however,because there is no trail or sidewalk along <br /> the east side of the roadway. There is a trail along the west side of Nowthen Boulevard,though crossing Nowthen <br /> Boulevard to get to it from 168th Avenue is not advised due to the speed of the roadway and the presence of a <br /> ditch between the trail and roadway. When the Coquina Street connection is reconstructed from a temporary <br /> design to a permanent design, it will include a sidewalk. <br /> Grading and Drainage <br /> There is a small area of wetland in the central portion of the south end of the site. No impacts to the wetland are <br /> proposed and the required buffers will be in place. Just northwest of the wetland will be the storm water basin for <br /> the site. The storm water plan will be reviewed by the Lower Rum River Watershed as part of the typical <br /> process. Slight adjustments may be required after their review,which is after City Council review of the <br /> preliminary plat. <br /> The site is being graded to accommodate split-entry or split-entry/walk-out house pads. <br /> Utilities <br /> The site is within the MUSA and municipal sanitary sewer and water lines will be installed. Water will be <br /> looped through the Coquina Street connection to the water main along 167th Avenue to provide adequate <br /> pressure. Sanitary sewer,however,will not be extended under the temporary Coquina Street roadway. It will <br /> need to be extended in the future should the adjacent property owners decide to subdivide. Both water and <br /> sanitary sewer will be extended to the east end of the site via 168th Lane to provide extension to the eastern <br /> property should that owner decide to subdivide in the future. <br /> Landscaping and Screening <br /> From the EPB's report for February 12, it was noted the only existing trees on the site are along the northern <br /> boundary and adjacent to the wetland in the southern portion of the site. The proposed tree removal exceeds the <br /> removal threshold(allowed to remove up to sixty percent [60%] of the significant tree DBH inches;this project is <br /> proposing to remove seventy-six percent [76%] of existing significant tree DBH inches). This requires <br /> reforestation of at least 331 inches of newly planted trees. The Landscape Plan includes 500 inches of new trees, <br /> which does satisfy the reforestation requirement. Landscape Plan The Landscape Plan provides a minimum of <br /> two (2)trees per lot,with the lots abutting Nowthen Boulevard and some of the lots abutting the elementary <br /> school parcel having additional plantings in the rear yards. Additionally,there are extra trees proposed in the rear <br /> yards that back up to the proposed storm water basins. There is a healthy mix of deciduous and evergreen trees <br /> with no genus constituting more than twenty percent(20%) of the overall plantings. All species and sizes are <br /> acceptable. The Planting Schedule indicates that some trees will be three (3)inches in size at the time of <br /> planting. The total proposed inches being planted should be updated, as it was based on all trees being 2.5 inches <br /> (meaning the reforestation is actually higher than the proposed 500 inches). Staff has also recommended that <br /> fencing, in addition to the proposed plantings,be installed now on the lots backing up to Nowthen Boulevard to <br /> assist with screening and possible noise reduction. <br /> Park Dedication and Trail Fees <br /> Park dedication is required with this plat. Cash in lieu of land is recommended as adjacent Brookside Elementary <br /> School serves the park function for the area. Trail Fees may also be satisfied in cash,but with potential credit for <br /> the trail connection to Brookside Elementary (The second exhibit entitled'P ark dedication exhibit' provides <br /> additional detail). More information will be available at the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.