Laserfiche WebLink
REFERENCE SYMBOLS BKV <br /> GENERAL GENERAL NOTES: IRRIGATION NOTES: G R O U P <br /> 1. LANDSCAPE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH EXISTING 1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING DESIGN+BUILD IRRIGATION PLAN <br /> DETAIL CALLOUT: REVISION: CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK. AND SPECIFICATIONS SUBMITTAUSHOP DRAWINGS AS PART OF THE SCOPE OF WORK WHEN <br /> INDICATES DETAIL REVISION NUMBER-SEE BIDDING.THESE SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. IT Architecture <br /> 1 CALLOUT NUMBER 1 REVISION HISTORY ON TITLE 2. LANDSCAPE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND DIMENSIONS SHOWN AND BRING SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT SODDED/SEEDED AND <br /> A101 BLOCK OF EACH SHEET TO THE ATTENTION OF THE LANDSCAPE ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND Interior Design <br /> INDICATES SHEET WHERE THE DESIGN AND/OR INTENT OF THE PROJECT'S LAYOUT. ABUTTING BUILDING FOUNDATION. Landscape Architecture <br /> DETAIL CALLOUT IS DRAWN 3. LANDSCAPE CONTRACTOR SHALL ASSURE COMPLIANCE WITH APPLICABLE CODES AND <br /> REGULATIONS GOVERNING THE WORK AND/OR MATERIALS SUPPLIED. 2� SHRUB&PERENNIAL BEDS TO BE IRRIGATED WITH DRIP IRRIGATION.SOD TO BE IRRIGATED Engineering <br /> WITH SPRAY, ROTORS OR ROTATOR HEADS AS REQUIRED. <br /> DETAIL: REVISION CLOUD: <br /> 4. LANDSCAPE CONTRACTOR SHALL PROTECT EXISTING ROADS,CURBS/GUTTERS,TRAILS,TREES, 3. LANDSCAPE IRRIGATION SYSTEM SHALL BE DESIGNED AND INSTALLED BY A STATE LICENSED <br /> 1 LAWNS AND SITE ELEMENTS DURING CONSTRUCTION OPERATIONS. DAMAGE TO SAME SHALL IRRIGATOR(OR EQUIVALENT LICENSED PROFESSIONAL). <br /> BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER. 222 North Second Street <br /> A101 <br /> INDICATES AREA OF DETAIL REVISION NUMBER-SEE <br /> 5. LANDSCAPE CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF UNDERGROUND AND 4. LANDSCAPE CONTRACTOR SHALL PROVIDE OWNER WITH AS-BUILT PLANS FOR INSTALLED SYSTEM. Long & Kees Bldg <br /> CUT PARALLEL TO VIEW 1 REVISION HISTORY ON TITLE ABOVE GRADE UTILITIES AND PROVIDE THE NECESSARY PROTECTION FOR SAME BEFORE 5. LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING/LAWN Suite 101 <br /> BLOCK OF EACH SHEET CONSTRUCTION/MATERIAL INSTALLATION BEGINS(MINIMUM 10'-0"CLEARANCE). IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIALS <br /> i �% GROWTH REQUIREMENTS. Minneapolis, MN <br /> ` 6 ROOT SYSTEMS OFUNDERGROUND LITIES ANYEXISTING TREES TO REMAINE INSTALLED SO . <br /> TRENCHES DO NOT CUT THROUGH 55401 <br /> j KEYNOTE: 6. LANDSCAPE CONTRACTOR SHALL INSURE THAT SOIL CONDITIONS AND COMPACTION ARE ADEQUATE <br /> `%% 7. EXISTING CONTOURS,TRAILS,VEGETATION, CURB/GUTTER AND OTHER ELEMENTS ARE BASED TO ALLOW FOR PROPER DRAINAGE AROUND THE CONSTRUCTION SITE. UNDESIRABLE CONDITIONS 61 2.339.3752 <br /> ? SEE CORRESPONDING SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING OF <br /> NUMBERED KEY NOTE ON UPON INFORMATION SUPPLIED TO THE LANDSCAPE ARCHITECT BY OTHERS. LANDSCAPE WORK. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE PROPER SURFACE <br /> SHEET WHERE REFERENCE CONTRACTOR SHALL VERIFY DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY AND SUBSURFACE DRAINAGE IN ALL PLANTING AREAS. <br /> DETAIL PLAN OR ELEVATION: OCCURS LANDSCAPE ARCHITECT OF SAME. WWW.bkvgroup.com <br /> 1 <br /> 8. ALIGNMENT AND GRADES OF THE PROPOSED WALKS,TRAILS AND/OR ROADWAYS ARE SUBJECT 7. COORDINATE IRRIGATION SLEEVING LOCATIONS WITH GENERAL CONTRACTOR. <br /> A101 INDICATES AREA OF TO FIELD ADJUSTMENT REQUIRED TO CONFORM TO LOCALIZED TOPOGRAPHIC CONDITIONS AND 8. RAIN&FREEZE SENSORS TO BE INCLUDED WITHIN THE IRRIGATION DESIGN. CONSULTANTS <br /> ENLARGED PLAN OR ELEVATION LEVEL: TO MINIMIZE TREE REMOVAL AND GRADING. CHANGES IN THE ALIGNMENT AND GRADES MUST <br /> ENLARGED ELEVATION INDICATES BE APPROVED BY THE LANDSCAPE ARCHITECT. 9. IRRIGATION LIMITS TO EXTEND TO STREET BACK OF CURB EXCEPT WHERE PROHIBITED BY LOCAL <br /> FLOOR LEVEL CODE OR ORDINANCE. <br /> 9. LANDSCAPE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN THE PLANT MATERIAL <br /> SELECTIONS AND OTHER SITE CONDITIONS WHICH MIGHT NEGATIVELY AFFECT PLANT 10. LANDSCAPE IRRIGATION SYSTEM SHALL COMPLY WITH ALL LOCAL, STATE&FEDERAL CODES& <br /> INDICATES FLOOR ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE PLANT MATERIAL SELECTIONS OR ORDINANCES. <br /> LEVEL ELEVATION SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT <br /> PRIOR TO BEGINNING OF WORK. 11. HAND TRENCHING REQUIRED WITHIN ROOT ZONE OF ANY EXISTING TREE. <br /> 10. LANDSCAPE CONTRACTOR SHALL PREPARE AND SUBMIT REPRODUCIBLE AS-BUILT DRAWING(S) 12. CONTRACTOR SHALL CONFIRM MIN.STATIC WATER PRESSURE OF 60psi. <br /> DETAIL CALLOUT: OF LANDSCAPE INSTALLATION, IRRIGATION AND SITE IMPROVEMENTS UPON COMPLETION OF <br /> INDICATES DETAIL NUMBER EXTERIOR ELEVATION: CONSTRUCTION INSTALLATION AND PRIOR TO PROJECT ACCEPTANCE. 13. IRRIGATION SYSTEM TO INCLUDE RAIN SENSOR AND SOIL MOISTURE SENSOR AS PART OF THE <br /> 1 INDICATES EXTERIOR 11. NO PLANTS WILL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN INSTALLATION. THESE REQUIREMENTS TO BE CONFIRMED DURING PROJECT SUBMITTAL PROCESS. PROJECT TITLE <br /> ELEVATION NUMBER <br /> A101 A101 COMPLETED IN THE IMMEDIATE AREA. �+ HAVI LAN D FIELDS <br /> INDICATES SHEET WHERE 12. SOD AREAS DISTURBED DUE TO GRADING SHALL BE REPLACED, UNLESS NOTED OTHERWISE. SURVEY NOTES: <br /> DETAIL IS DRAWN INDICATES SHEET <br /> WHERE EXTERIOR <br /> ELEVATION IS DRAWN 13. WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD 1"BELOW 1. ALL EXISTING CONDITIONS SHOWN ON THIS DRAWING ARE BASED ON AN OWNER-FURNISHED <br /> INDICATES AREA OF DETAIL SURFACE ELEVATION OF TRAIL,SLAB,CURB, ETC. SURVEY. BKV GROUP OFFERS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, FOR THE <br /> CUT PERPENDICULAR TO ACCURACY OR RELIABILITY OF THE INDICATED EXISTING CONDITIONS. ISSUE # DATE DESCRIPTION <br /> VIEW 14. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON <br /> SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, SOD SHALL BE STAKED SECURELY. 1 2024-02-09 SITE PLAN REVIEW <br /> BUILDING SECTION: 2. THE CONTRACTOR SHALL FIELD VERIFY ALL CRITICAL EXISTING CONDITIONS INCLUDING, BUT <br /> INDICATES NOT LIMITED TO, EXISTING BUILDING LOCATIONS, UTILITY LOCATIONS AND INVERT ELEVATIONS, 2 2024-03-12 SITE PLAN REVIEW r1 <br /> INDICATES BUILDING _ ACCESSIBLE EXTERIOR 15. PROPOSED PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN AND EXISTING SITE GRADES PRIOR TO THE START OF WORK. <br /> SECTION NUMBER DOOR LOCATION STANDARD FOR NURSERY STOCK,ANSI Z60.1. UNLESS NOTED OTHERWISE, DECIDUOUS SHRUBS <br /> 1 SHALL HAVE AT LEAST 5 CANES AT THE SPECIFIED HEIGHT. ORNAMENTAL TREES SHALL HAVE 3. ANY OBSERVED DEVIATIONS FROM CONDITIONS INDICATED ON THE DRAWINGS SHALL BE <br /> A101 NO'V'CROTCHES AND SHALL BEGIN BRANCHING NO LOWER THAN 3 FEET ABOVE THE ROOT BROUGHT TO THE ARCHITECT OR LANDSCAPE ARCHITECT'S ATTENTION IMMEDIATELY UPON <br /> BALL. STREET AND BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 6'ABOVE DISCOVERY. NO WORK SHALL PROCEED IN THE AREAS OF ANY DISCOVERED DEVIATIONS UNTIL <br /> INDICATES SHEET WHERE FINISHED GRADE. <br /> BUILDING SECTION IS THE DIFFERENCES ARE RESOLVED. <br /> DRAWN 16. LANDSCAPE CONTRACTOR SHALL ASSURE COMPLIANCE WITH APPLICABLE CODES AND <br /> REGULATIONS GOVERNING THE WORK AND/OR MATERIALS SUPPLIED. <br /> 17. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF NEWLY INSTALLED SITE PLAN NOTES: <br /> GENERAL ABBREVIATIONS MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ACTS OF VANDALISM OR DAMAGE WHICH MAY <br /> OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE LANDSCAPE NO BUILDING SIGNAGE PROPOSED AT THIS TIME. <br /> CENTER LINE AD=AREA DRAIN(HARDSCAPE) CONTRACTOR. <br /> BS=BOTTOM STEP 18. LANDSCAPE CONTRACTOR SHALL WARRANTY NEW PLANT MATERIAL THROUGH ONE CALENDAR TRASH/RECYCLING WILL BE COLLECTED WITHIN THE BUILDING AT GROUND LEVEL. <br /> ------------ LIMIT OF WORK CL=CENTER LINE YEARS FROM THE DATE OF THE OWNER ACCEPTANCE. NO PARTIAL ACCEPTANCE WILL BE COLLECTION WILL OCCUR ON-SITE WITHIN ENCLOSED LOADING AREAS BY PRIVATE <br /> EJ=EXPANSION JOINT CONSIDERED. VENDORS. <br /> GB=GRADE BREAK <br /> MATCH LINE HP=HIGH POINT 19. PLANTING AREAS(NOT OVER STRUCTURE)RECEIVING GROUND COVER, PERENNIALS,ANNUALS, SNOW WILL BE REMOVED FROM SIDEWALKS.A LIMITED AMOUNT OF SNOW STORAGE IS <br /> LOW POINT . AVAILABLE ALONG THE STREET BOULEVARDS. <br /> ----- EJ EXPANSION JOINT PIDLP =AREA DRAIN(PLANTING) AND/OR VINES SHALL RECEIVE A MINIMUM OF 18"DEPTH OF PLANTING SOIL CONSISTING OF AT <br /> POB=POINT OF BEGINNING LEAST 45 PARTS TOPSOIL,45 PARTS SCREENED COMPOST OR MANURE AND 10 PARTS SAND. <br /> N <br /> CONTROL JOINT TC=TOP OF CURB 20. ANNUAL AND PERENNIAL PLANTING BEDS TO RECEIVE 4"DEEP SHREDDED HARDWOOD MULCH <br /> 0 TR=TOP OF RAMP WITH NO WEED BARRIER. <br /> NI ���������� STEEL EDGING TS=TOP STEP <br /> TW=TOP OF WALL 21. SHRUB BED MASSINGS TO RECEIVE 4"DEEP SHREDDED HARDWOOD MULCH WITH FIBER MAT <br /> Q ----- GB WEED BARRIER. <br /> ----- GRADE BREAK <br /> _jI 22. STEEL EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS AND ANNUALS WHERE PLANTING <br /> _ BED MEETS SOD UNLESS OTHERWISE NOTED. <br /> J <br /> O 23. REFER TO CIVIL FOR SITE DEMOLITION INFORMATION. <br /> 72 GRADING LEGEND <br /> O 24. REFER TO CIVIL FOR ADDITIONAL SITE GRADING AND UTILITY INFORMATION <br /> JI PROPOSED SPOT ELEVATION CERTIFICATION <br /> O 42.05 25. IF A DISCREPANCY EXISTS BETWEEN THE NUMBER OF PLANTS SHOWN IN THE PLANT MATERIALS <br /> 6 42.05 ME MATCH EXISTING ELEVATION SCHEDULE AND THE PLANS,THE PLANS SHALL GOVERN. <br /> co 26. CONTRACTOR SHALL STAKE OUT LOCATION OF ALL PROPOSED TREES FOR APPROVAL BY <br /> N 42.05 TS TOP OF STEP <br /> .-. LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. O O <br /> 0 42.05 BS BOTTOM OF STEP 27. ANY TREE CLEARING THAT INVOLVES OAK TREES SHALL BE COMPLETED PRIOR TO APRIL 15 OR <br /> 04 AFTER JULY 15 TO HELP LIMIT THE INTRODUCTION OF OAK WILT INTO THE AREA. <br /> 42.05 TR TOP OF RAMP O `�G <br /> J 42.05 BR BOTTOM OF RAMP 28. PER THE CITY'S DEVELOPMENT AGREEMENT,ANY LANDSCAPE WORK COMPLETED ON SITE WILL <br /> V <br /> O INCLUDE A 2-YEAR MAINTENANCE GUARANTEE FROM THE DATE OF APPROVAL OF LANDSCAPE <br /> INSTALLATION BY THE CITY. <br /> _ 2°�°MAX. SLOPE INDICATOR 1J <br /> O O <br /> � 29. ALL AREAS INCLUDED IN THE LIMITS OF DISTURBANCE THAT ARE NOT OTHERWISE IMPROVED <br /> J <br /> 42.05 TC TOP OF CURB WITH IMPERVIOUS SURFACING SHALL RECEIVE 4 INCHES OF TOPSOIL WITH NO MORE THAN 35% <br /> a 42.05 BC BOTTOM OF CURB SAND CONTENT. <br /> E <br /> O FFE=42.05 FINISH FLOOR ELEVATION <br /> DRAWN BY SB <br /> co GRADE BREAKLINE CHECKED BY BH <br /> L <br /> O COMMISSION NUMBER 2236-10 <br /> FINISH GRADE(LANDSCAPE) FG SHEET TITLE <br /> P <br /> n FINISH SURFACE(HARDSCAPE) FS <br /> O POOL COPING PC LANDSCAPE NOTES / <br /> co TOP OF DRAIN TD GRAPHIC LEGEND <br /> N C) <br /> Zzz O <br /> Uco RIM ELEVATION/INVERT ELEVATION RIM/INV <br /> cY) <br /> p0 WATER LEVEL WL SHEET NUMBER <br /> _�e � <br /> U) CV <br /> O O <br /> -0N L002 <br /> O N <br /> Q c� TRUE NORTH PLAN NORTH <br /> © 2024 BKV Group <br />