My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:16:56 AM
Creation date
5/15/2024 11:00:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL EXPLORATIONS <br /> CITY OF RAMSEY <br /> CITY PROJECT # 24-13 <br /> FOX RIDGE ESTATES <br /> STREET RECONSTRUCTION <br /> RAMSEY, MINNESOTA <br /> ITT PROJECT 23-193 <br /> A. Introduction <br /> This report is being prepared for use by our client on this specific project.We intend to present this <br /> report and our findings in the same logical manner that led us to arrive at our recommendations. <br /> This report is based on some general assumptions regarding the anticipated construction based on <br /> experience with similar projects. These assumptions and the entire report should be reviewed <br /> immediately upon receipt. <br /> Purpose⢠<br /> The purpose of our investigation was to evaluate the existing soil and water conditions on this site <br /> for the purpose of reconstructing the existing roadway. The project will consist of reconstruction of <br /> the existing streets in Fox Ridge Estates lst and 2"d Additions in the northeast part of Ramsey, <br /> Minnesota. The streets include 170th Ave NW, 172"a Lane NW, 173ra Avenue NW, 174th Avenue <br /> NW, Wolfram Street NW, Tungsten Street NW, Sodium Street NW and Potassium Street NW. The <br /> streets will be reconstructed to an urban section. New storm sewers and watermains will be <br /> installed. In accordance with your written authorization, we have conducted a subsurface <br /> exploration program for the proposed project. <br /> Scope of Services: <br /> Our authorized scope of services included the following: <br /> 1. To core the pavement at twenty-six (26) locations to determine the existing <br /> pavement thickness. <br /> 2. To investigate the subsurface soil and water conditions encountered at those same <br /> twenty-six (26) locations using split spoon sampling. The borings were planned to <br /> depths often(10) feet at each location. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.