nEA5. <br /> www.ae2s.com <br /> 013 RFP 005 Jet Mixing System Pump $161834.33 y Approved— <br /> Modifications Construction Contingency Expense 3 <br /> 014 RFP 009 Backwash Tank Overflow $11534.38 y Approved— <br /> Construction Contingency Expense 3 <br /> 015 Field Order Field Order No.4-Door $101922.45 y Approved— <br /> 004 Hardware Changes Construction Contingency Expense 3 <br /> Door <br /> 016 Hardware Door Hardware Changes $561724.85 y Approved— <br /> Construction Contingency Expense 3 <br /> Meeting <br /> 017 RFP 010 Filter Slab Modifications $961634.23 y Pending— <br /> Construction Contingency Expense 4 <br /> 018 Field Conduit Encasement $51389.13 y Approved— <br /> Directed Construction Contingency Expense 4 <br /> 019 Field Order North Sump Pit $61764.43 y Pending— <br /> 012 Construction Contingency Expense <br /> 5 <br /> 020 Field Order CB 1 Air Flow Sleeves $4,617.83 y Pending— <br /> 013 Construction Contingency Expense 5 <br /> 021 RFP 013 Torpedo Sand Filter Layer $271979.43 N Pending— <br /> Construction Contingency Expense 5 <br /> Note:Any extension delays will be approved as a separate Change Order and will not be included in this Construction <br /> Contingency Expense. <br /> Proposal No. 019(Field Order No. 012): North Sump Pit: <br /> During construction and submittal review, it was determined that a drain pipe was required to be added <br /> from the sump in the Sump Pump Closet room to connect with the stubbed waste piping from Sanitary <br /> Manhole No. 3. Engineer provided additional direction on installation of 8" PVC just above water stop at <br /> elevation of 96' to drain to manhole 3. As well as PVC installation, a sloped concrete fill will be placed in <br /> sump pit to avoid pooling. Contractor price reflects material and labor. <br /> Proposal No. 020(Field Order No. 013): CB1 Air Flow Sleeves: <br /> To ensure adequate air flow between structural beams within the Clearwell and Backwash Tank, 3" <br /> diameter PVC sleeves will be installed approximately 4' apart in the CB 1 beams. This addition limits the <br /> possibility of a pressure buildup within the tanks. Contractor price reflects material and labor. <br /> Proposal No. 021 (RFP 013): Torpedo Sand Filter Layer: <br /> Recent information from various suppliers around the industry has suggested that when greensand is <br /> installed over support gravel, there is a high likelihood of greensand migration into the gravel layer. This <br /> typically results in a reduction in depth of the greensand layer by 1" to 3". The addition of a 3" layer of <br /> torpedo sand at the interface between the gravel and greensand layer has been recommended by suppliers. <br /> This layer helps create a barrier to prevent the greensand media from infiltrating the support gravel. This is <br /> not required, but highly recommended to assist in maintaining media depths for the life of the media. <br /> Contractor price reflects material and labor. <br /> Advanced Engineering and Environmental Services, Inc. <br /> 6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />