Laserfiche WebLink
AGN� C O N S T R U C T IO N Proposal <br /> r� COMMERCIAL 5 INDUSTRIAL CONTRACTORS <br /> 1401 Park Road - Chanhassen, MN 55317 <br /> www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br /> SEND TO <br /> Company name From <br /> AE2S Noah Pundsack <br /> Attention Date: 4/2/2024 <br /> Mr. Ryan Hanson <br /> E-mail Phone Magney Proposal# 19 <br /> Ryan.Hanson ae2s.com (612)220-0154 Field Order No. 012 North Sump Pit <br /> F1Urgent F1 Please comment Fx_1 Please review For your information <br /> Total pages,including cover. 3 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant- Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br /> material, and equipment needed to complete the requested changes from Field Order No. 012 / <br /> Supplemental Instructions to add a sloped base in the North sump pit up to the invert of the effluent piping. <br /> As well as adding a wall pipe and pipe sleeve to pass the effluent line through the stoop. Please see the <br /> costs associated with this change are summarized below. <br /> Labor: Pour A Sloped Base In Sump Pit, Install added Wall Sleeve & Pipe $ 1,425.90 <br /> Material: Core & Main. (see attached) (includes sales tax) $ 13461.03 <br /> Material: Added 8" PVC Pipe $ 219.28 <br /> Material: Sloped Concrete Base $ 486.56 <br /> Equipment: Misc. Small Tools and Equipment(10% of Labor) $ 142.59 <br /> Subcontractor: Miller Excavating, Inc. (see attached) $ 2,256.00 <br /> Subtotal $53991.36 <br /> General Contractor's Overhead $ 673.10 <br /> Bond & Insurance premiums $ 99.97 <br /> Lump Sum Total: $ 6,764.43 <br /> Additional Calendar Days Required for this Change (Including material lead time): 0.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> Noah PaNdsae4 <br /> Noah Pundsack <br /> Project Engineer Accepted By Date <br /> Page 1 of 772 <br />