My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:16:56 AM
Creation date
5/15/2024 11:00:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�1GNE C O N S T R U C T IO N Proposal <br /> �— COMMFROA1 FT iNnilqTRIAI rONTRACTORS <br /> 1401 Park Road - Chanhassen, MN 55317 <br /> www.ma9neyconstruction.com 952.474.1674 Office 952.474-1679 Fax <br /> SEND TO <br /> Company name From <br /> AE2S Noah Pundsack <br /> Attention Date: 0410112024 <br /> Mr. Ryan Hanson <br /> E-mail Phone Magney Proposal#020 <br /> Rvan.HansonCcb.ae2s.com (612)220-0154 Field Order No. 013 C131 Air Flow Sleeve Detail <br /> F] Urgent F1 Please comment Fx Please review � For your information <br /> Total pages,including cover: 2 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant - Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br /> material, and equipment needed to complete the requested changes from Field Order No. 013 / <br /> Supplemental Instructions to add approximately twenty-four (24) 3" diameter Air Flow sleeves to the C131 <br /> beams in the Pumping Chamber and Backwash tanks. Please see the costs associated with this change are <br /> summarized below. <br /> Labor: Cut PVC Sleeves, Tape the Ends, and Install In All Four CB1 Beams $ 37406.90 <br /> Material: 3" SCH 40 PVC Pipe (see attached) (includes sales tax) $ 208.57 <br /> Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 340.69 <br /> Subcontractor: <br /> Subtotal $37956.16 <br /> General Contractor's Overhead $ 593.42 <br /> Bond & Insurance premiums $ 68.24 <br /> Lump Sum Total: $ 47617.83 <br /> Additional Calendar Days Required for this Change (Including material lead time): 0.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> NoAli Pt4md9ac4 <br /> Noah Pundsack <br /> Project Engineer Accepted By Date <br /> Page 1 of 772 <br />
The URL can be used to link to this page
Your browser does not support the video tag.