Laserfiche WebLink
J <br /> Field Order/ Supplemental Instruction <br /> Project: Ramsey Water Treatment Plant Field Order No.: FO-013 <br /> Date: 3/27/2024 <br /> To: Kevin Vranicar From: Ryan Hanson <br /> Title: Project Manager Title: Resident Project Representative <br /> Company: Magney Construction, Inc. <br /> 1401 Park Road <br /> Address: AE2S No.: f'05434-2020-002 <br /> Chanhassen, MN 55317 <br /> You are hereby directed to execute this Field Order/Supp/ementa//nstruction that interprets or pro sides for <br /> minor revisions to the Contract Documents without changes to the Contract Price or Time. <br /> Specification Section(s): <br /> Referenced Document(s): 0 <br /> Drawing(s): Concrete beam sleeve detail <br /> Description of Interpretation or Change: <br /> CB 1 beams within the Clearwell and the backwash tank are to contain PVC piping to allow for free flow of air <br /> through the beams. See attached document for details. <br /> Attachments: Supplemental Instructions <br /> Signature: Ryan Hanson <br /> 0 Attachments (/isj: ❑ Posted on Newforma <br /> Concrete beam sleeve detail ❑ Field Office, Ryan Hanson,AE2S <br /> Copies: <br /> M AE2S File <br /> ❑ Other: <br /> Ramsey Water Treatment Plant Page 1 <br />