Laserfiche WebLink
7.4. <br /> CC Regular Session <br /> Meeting Date: 05/14/2024 <br /> Primary Strategic Plan Initiative: Connect the community through Parks,Trails and Recreational Programming. <br /> Information <br /> Title: <br /> Adopt Resolution#24-131 Accepting Bids,Awarding Contract and Authorizing Funding for Improvement Project#24-54,The Waterfront <br /> Purpose/Background: <br /> Background <br /> As part of the city's community park system,a water-centric park known as The Waterfront has been envisioned for more than a decade in <br /> Ramsey's downtown.In the Fall of 2023,the mass grading and establishment seeding for the park was completed. At the Park& <br /> Commission's regular January 2024 meeting,the Commission recommended,and City Council subsequently approved,preparing plans and <br /> specifications and obtaining bids for the trail around the 7 acre pond and associated improvements,which included trees and site furnishings <br /> (benches,bike racks and trash receptacles with concrete pads). The following were the preliminary project cost estimates: <br /> Estimate <br /> Grading,Trail and Boulder Wall $2221613 <br /> Trees(60) $47,900 <br /> Concrete Flat Work $881060 <br /> Furnishings $331700 <br /> Contingency(approx. 10%) $391000 <br /> Construction Staking/Survey $15,000 <br /> Total $446,273 <br /> Purpose <br /> The purpose of this case is to award a contract for the construction of the trail and authorize the balance of funding for planting 60 <br /> trees and providing concrete pads, benches, trash receptacles and bike racks for the park. <br /> Time Frame/Observations/Alternatives: <br /> Observations <br /> Following authorization to obtain costs for the construction of the trails,trees and furnishings,the aforementioned Ad for Bid and Requests <br /> for Quotations were issued—and the following actual costs were determined to complete the park project in the Summer of 2024. <br /> Estimate Actual <br /> Grading,Trail and Boulder Wall $222,613 Grading,Trail and Boulder Wall $169,165 <br /> Trees(60) $47,900 Trees(60) $321730 <br /> Concrete Flat Work $88,060 Concrete Flat Work $661320 <br /> Furnishings $33,700 Furnishings $33,700 <br /> Contingency(approx. 10%) $39,000 Contingency(approx. 10%) $301000 <br /> Construction Staking/Survey $15,000 Construction Staking/Survey $13.844 <br /> Total $446,273 Total $3459759 <br /> Alternatives <br /> Alternatives include: <br /> 1)Not proceeding with park improvements at this time. <br /> 2)Proceeding with park improvements as identified. <br /> 3)Some other unspecified option. <br /> Additional information will be available at the meeting. <br /> Funding Source: <br /> The funding for Improvement Project#24-54, The Waterfront, would be from the Park Trust Fund,which has a present balance of <br /> >$7M. <br /> Recommendation: <br />