Laserfiche WebLink
(6) Drawing(s) <br /> (7) All addenda issued by the Engineer prior to the time of the opening of the bids. <br /> (8) Supplemental Agreements & Change Orders <br /> 1.10 Contract Price: The total monies payable to the Contractor under the contract documents. <br /> 1.11 Contract Time: The number of calendar days stated in the contract documents for the <br /> completion of the work. <br /> 1.12 Contractor: The individual, partnership, or corporation undertaking the execution of the work <br /> under the terms of the contract and acting directly or through a duly authorized representative. <br /> 1.13 Engineer: By the term "Engineer" is meant City Engineer for the City of Ramsey, who has <br /> been appointed by the Owner to take charge of the work contemplated by these specifications and <br /> accompanying drawings and is designated and referred to in these specifications as the "Engineer". <br /> (The Engineer or Owner may appoint an authorized representative or inspector, limited in authority, <br /> assigned to make inspection of the work performed and materials furnished by the Contractor. Such a <br /> representative has no authority to order or permit deviation from plans and specifications.) <br /> 1.14 Field Order: A written order affecting a change in the work not involving an adjustment in the <br /> contract price or an extension of the contract time, issued by the Engineer to the Contractor during <br /> construction. <br /> 1.15 Notice of Award: The written notice of the acceptance of the bid issued by the Owner to the <br /> Successful bidder. <br /> 1.16 Notice to Proceed: The written notice issued by the Owner to the Contractor authorizing him <br /> to proceed with the work and establishing the date of commencement of the work. <br /> 1.17 Owner: A private, public or quasi-public body or authority, corporation, association, <br /> partnership, or individual for whom the work is to be performed. <br /> 1.18 Plans: The term means the official drawings, plans, profiles, elevation, cross sections and <br /> supplemental drawings, or reproductions thereof, approved by the Engineer, which show the location, <br /> character, dimensions and details of work to be performed. All such drawings, as listed elsewhere in <br /> the contract documents, are a part of the plans whether attached to the contract documents or separate <br /> therefrom. <br /> 1.19 Project: The undertaking to be performed as provided in the contract documents. <br /> 1.20 Project Representative: The term means an authorized representative of the Engineer, assigned <br /> to make any or all necessary inspections of the work performed and the materials furnished by the <br /> Contractor. <br /> GC 3 <br />