Laserfiche WebLink
A.W.W.A.: The American Water Works Association. All references to A.W.W.A. specifications shall <br /> be understood to refer to their latest published edition. <br /> MnDOT: The Minnesota Department of Transportation. All references to MnDOT specifications <br /> shall be understood to refer to their latest published edition. <br /> M.S.S.: Minnesota State Statutes. All references to M.S.S. shall be understood to refer to the latest <br /> published edition. <br /> ARTICLE 2. Progress and Submission Schedule; Pre-Construction Conference; Time of <br /> Starting Work <br /> 2.1 Within 10 Calendar Days after execution of this Agreement, the Contractor shall prepare and <br /> submit to the Engineer for review an estimated progress schedule indicating the starting and <br /> completion dates of the various stages of the Work and a schedule of Shop Drawing submissions. <br /> 2.2 Before starting the Work, a conference will be held to review the above schedules, to establish <br /> procedures for handling Shop Drawings and other submissions and to establish a working <br /> understanding between the parties as to the Project. Present at the conference will be the Engineer, <br /> Project Representative, the Contractor, his superintendent, the Owner and any others who may have <br /> an interest in the Project. <br /> 2.3 Prior to starting the Work, the Contractor will furnish the Engineer certificates of insurance as <br /> required by the appropriate provisions of the Contract Documents. <br /> 2.4 The Work contemplated hereunder shall be commenced within ten (10) Calendar Days after <br /> receipt by the Contractor of written Notice to Proceed from the Engineer and shall be completed <br /> within the time limits set forth in the Special Provisions or as specified elsewhere in the Contract <br /> Documents. <br /> 2.5 If the Contractor is delayed in the performance of the Work by any neglect of Owner or <br /> Engineer, or by an employee, agent or representative of either, or by changes ordered in the Work, or <br /> by the combined action of workmen (either those employed on the Work or in any industry essential <br /> to the conduct of the Work) in no way caused by or resulting from the default or collusion on the part <br /> of the Contractor, or by strikes, lockouts, embargoes, fire, unavoidable casualties, unusual delays in <br /> transportation, national emergency, or by any other causes which Contractor could not reasonably <br /> control or circumvent, the scheduled completion date and interim completion dates shall be extended <br /> for a period equal to the length of such delay if within five Calendar Days after expiration of any such <br /> delay Contractor delivers to Engineer a written request for extension for such delay, and such request <br /> is approved by the Owner or Engineer, which approval shall not be unreasonably withheld by Owner <br /> or Engineer. In case of a continuing cause of delay of a particular nature, Contractor shall be required <br /> to make only one such request with respect thereto. Extension of time shall be the Contractor's sole <br /> remedy for any such delay (except for Contractor's right to terminate this Agreement pursuant to the <br /> provisions of Article 43 hereinafter), unless the same shall be caused by acts constituting intentional <br /> interference by the Owner or Engineer with Contractor's performance of the Work and where to the <br /> GC 5 <br />