Laserfiche WebLink
ARTICLE 19. Access to the Work: Uncovering Finished Work <br /> 19.1 The Engineer will at all times have access to the Work. The Contractor will provide proper <br /> facilities for such access and observation of the Work and also for any inspection, or testing thereof <br /> by others. <br /> 19.2 If any Work is covered contrary to the request of the Engineer, it must, if requested by the <br /> Engineer, be uncovered for observation and replaced at the Contractor's expense. <br /> 19.3 If any Work has been covered which the engineer has not specifically requested to observe <br /> prior to its being covered, or if the Engineer considers it necessary or advisable that covered Work be <br /> inspected or tested by others, the Contractor, at the Engineer's request, will uncover, expose or <br /> otherwise make available for observation, inspection or testing as the Engineer may require, that <br /> portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found <br /> that such Work is defective or does not meet the requirements of the Contract Documents, the <br /> Contractor will bear all the expenses of such uncovering, exposure, observation, inspection and <br /> testing and of satisfactory reconstruction, including compensation for additional professional <br /> services, and an appropriate Change Order shall be issued depicting all such costs from the Contract <br /> Price. If, however, such Work is found to be non-defective and meets the requirements of the <br /> Contract Documents, the Contractor will be allowed an increase in the Contract Price or extension of <br /> the Contract Time directly attributable to such uncovering, exposure, observation, inspection, testing <br /> and reconstruction, provided the Engineer first obtained uncovering approval from the Owner. <br /> ARTICLE 20. Changes in the Work <br /> 20.1 Without invalidating the Agreement, the Owner may, at any time or from time to time, order <br /> additions, deletions or revisions in the Work; these will be authorized by Change Orders. Upon <br /> receipt of a Change Order, the Contractor will proceed with the Work involved. All such Work shall <br /> be executed under the applicable conditions of the Contract Documents. If any Change Order causes <br /> an increase or decrease in the Contract Price or an extension or shortening of the Contract Time, an <br /> equitable adjustment will be made as provided in the Contract Documents. <br /> 20.2 The Engineer may authorize minor changes or alterations in the Work not involving extra cost <br /> and not inconsistent with the overall intent of the Contract Documents. These may be accomplished <br /> by a Field Order. <br /> 20.3 Additional Work performed by the Contractor without authorization of a Change Order will <br /> not entitle him to an increase in the Contract Price or an extension of the Contract Time, except in the <br /> case of an emergency as provided in elsewhere herein. <br /> 20.4 The Owner will execute any appropriate Change Order prepared by the Engineer covering <br /> changes in the Work to be performed and work performed in an emergency and any other claim of the <br /> Contractor for a change in the Contract Time or the Contract Price which is approved by the Owner <br /> and Engineer. <br /> GC 16 <br />