My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:16:56 AM
Creation date
5/15/2024 11:00:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 22. Change of Contract Time <br /> 22.1 The Contract Time may only be changed by a Change Order. If the Contractor is entitled by <br /> the Contract Documents to make a claim for an extension in the Contract Time, the claim shall be in <br /> writing delivered to the Engineer within five (5) calendar days after expiration of any such delay of <br /> the occurrence of the event giving rise to the claim. All valid claims for adjustment in the Contract <br /> Time shall be determined by the Engineer. Any change in the Contract Time resulting from any such <br /> claim shall be incorporated into a Change Order. <br /> 222 The Contract Time will be extended in an amount equal to time lost due to delays beyond the <br /> control of the Contractor, if he makes a claim therefrom as provided in this Agreement. Such delays <br /> shall include, but not be restricted to, acts or neglect by any separate Contractor employed by the <br /> Owner, fires, floods, labor disputes, epidemics, abnormal weather conditions, or acts of God. <br /> 223 All time limits stated in the Contract Documents are of the essence of the Agreement. The <br /> provisions of this Article shall not exclude recovery for damages (including compensation for <br /> additional professional services) for delay by either party. <br /> ARTICLE 23. Neglected Work <br /> If the Contractor should neglect to prosecute the Work in accordance with the Contract Documents, <br /> including any requirements of the progress schedule, the Owner, after five (5) Calendar Day's written <br /> notice to the Contractor may, without prejudice to any other remedy, make good such deficiencies <br /> and the cost thereof (including compensation for additional professional services) shall be charged <br /> against the Contractor, in which case a Change Order shall be issued incorporating the necessary <br /> revisions in the Contract Documents including an appropriate reduction in the Contract Price. If the <br /> payments then or thereafter due to the Contractor are not sufficient to cover such amount, the <br /> Contractor will pay the difference to the Owner. <br /> ARTICLE 24. Warranty and Guarantee: Correction, Removal or Acceptance of Defective <br /> Work <br /> 24.1 The Contractor warrants and guarantees to the Owner that all materials and equipment will be <br /> new unless otherwise specified and that all Work will be of good quality and free from faults or <br /> defects and in accordance with the requirements of the Contract Documents and of any inspections, <br /> tests or approvals referred to elsewhere in the Contract Documents. All unsatisfactory Work, all <br /> faulty or defective Work and all Work not conforming to the requirements of the Contract Documents <br /> or of such inspections, tests or approvals shall be considered defective. Prompt notice of all defects <br /> shall be given to the Contractor. All defective Work, whether or not in place, may be rejected. <br /> 242 If required by the Engineer, prior to approval of final payment, the Contractor will promptly, <br /> without cost to the Owner and as required by the Engineer, either correct any defective Work, <br /> whether or not fabricated, installed or completed, or, if the Work has been re j ected by the Engineer, <br /> remove it from the Work site and replace it with non-defective Work. If the Contractor does not <br /> GC 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.