Laserfiche WebLink
37.2 The Contractor's public liability insurance and property damage insurance shall provide the <br /> primary coverage on all claims arising out of the performance of the Agreement, and shall name the <br /> Owner, its officers, agents and employees, and the Engineer as additional insureds therein. <br /> ARTICLE 38. Insurance Coverage for Special Conditions <br /> When the construction is to be accomplished within a public or private right-of-way requiring <br /> insurance coverage, the Contractor shall conform to the particular requirements and provide the <br /> required insurance. The Contractor shall include in his liability policy all endorsements that the said <br /> authority may require for the protection of the authority, its officers, agents and employees. <br /> Insurance coverage for special conditions, when required, shall be provided as set forth in the Special <br /> Provisions. <br /> ARTICLE 39. Cleaning Up <br /> The Contractor will keep the premises free from accumulations of waste materials, rubbish and other <br /> debris resulting from the Work, and at the completion of the Work he will remove all waste materials, <br /> rubbish and debris from and about the premises and will remove all items of personal property such <br /> as all tools, construction equipment and machinery, and surplus materials, and further will leave the <br /> site broom-clean and ready for occupancy by the Owner. The Contractor will restore to the original <br /> condition those portions of the Work site not designated for alteration by the Contract Documents. <br /> ARTICLE 40. Owner's Right to Stop or Suspend Work <br /> 40.1 If the Work is defective, or the Contractor fails to supply sufficiently skilled workmen or <br /> suitable materials or equipment, or if the Contractor fails to make prompt payments to <br /> Subcontractors, or for labor, materials or equipment, the Owner may order the Contractor to stop the <br /> Work, or any portion thereof, until the cause for such order has been eliminated. <br /> 40.2 The Owner may, at any time and without cause, suspend the Work or any portion thereof, for <br /> a period of not more than one hundred eighty (180) days by notice in writing to the Contractor and <br /> the Engineer which shall fix the date on which Work shall be resumed. The Contractor will resume <br /> the Work on the date so fixed. <br /> ARTICLE 41. Owner's Right to Terminate <br /> 41.1 If the Contractor is adjudged bankrupt or insolvent, or if he makes a general assignment for <br /> the benefit of his creditors, or if a trustee or receiver is appointed for the Contractor or for any of his <br /> property, or if he files a petition to take advantage of any debtor's act, or to reorganize under the <br /> bankruptcy or similar laws, or if he repeatedly fails to supply sufficiently skilled workmen or suitable <br /> materials or equipment, or if he repeatedly fails to make prompt payments to Subcontractors, or for <br /> labor, materials or equipment, or if he disregards laws, ordinances, rules, regulations or orders of any <br /> public body having jurisdiction, or if he disregards the authority of the Engineer, or if he otherwise <br /> violates any provision of the Contract Documents, then the Owner may, without prejudice to any <br /> other right or remedy and after giving the Contractor and his Surety seven (7) Calendar Days written <br /> notice, terminate the services of the Contractor and take possession of the Project and of all materials, <br /> GC 25 <br />