My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/19/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 10/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:01 AM
Creation date
5/23/2024 10:46:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6.2. <br /> Meeting Date: 10/19/2021 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Title: <br /> Review Final Northwest Metro Regional Surface Water Supply Study <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to review the final version of the Northwest Metropolitan Area Regional Surface Water <br /> Supply Study. <br /> Background: <br /> Over the years,the City of Ramsey has explored the use of surface water to augment, or possibly replace, <br /> groundwater supply as the source of our municipal water supply system. <br /> In 2018,the Metropolitan Council funded a study to explore the feasibility of constructing a regional surface water <br /> supply facility in the northwest metro area to serve the cities of Corcoran, Dayton,Ramsey and Rogers. This study <br /> was completed in the fall of 2020.Attached is a copy of the final study. <br /> Per prior Committee direction, Staff will briefly summarize the findings of the final study. A copy of the final study <br /> is attached(even though the cover sheet of the attached study says "Draft",it is the final study). <br /> Timeframe: <br /> Staff anticipates approximately 10 minutes will be required to present and discuss this case. <br /> Observations/Alternatives: <br /> The primary objective of the study was to understand relative costs and implementation considerations of different <br /> surface water use approaches to long-term water sustainability within the study area. This study will support future <br /> planning of local area water supplies and water sustainability practices.As cities face increased demands on their <br /> water supplies in the future,this study may provide concept/planning level options for future consideration. <br /> Funding Source: <br /> This study was fully funded by the Metropolitan Council. The only cost to the City of Ramsey was Staff s time to <br /> participate in the study. <br /> Recommendation: <br /> Action: <br /> No action required. The purpose of this case is simply to summarize the findings of the study at a high level. <br /> Attachments <br /> MCES NW Metro Regional Surface Water Study <br /> SEH Next Steps Memo <br /> Form Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.