My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/19/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 10/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:01 AM
Creation date
5/23/2024 10:46:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
List of Figures <br /> FIGURE ES-1. PHASED APPROACH TO TRUNK WATERMAIN CONSTRUCTION ..................................... ES-2 <br /> FIGURE ES-2. PHASED REGIONAL WATER SYSTEM WITH A WTP IN RAMSEY....................................... ES-3 <br /> FIGURE ES-3. PHASED REGIONAL WATER SYSTEM WITH A WTP IN DAYTON....................................... ES-4 <br /> FIGURE1-1. STUDY AREA. .................................................................................................................................... 2 <br /> FIGUE 1-2. EXISTING WATER INFRASTRUCTURE.............................................................................................. 5 <br /> FIGURE 1-3. GROWTH AND WATER DEMAND PROJECTIONS FOR THE STUDY AREA................................ 6 <br /> FIGURE 2-2.AVERAGE TOTAL ORGANIC CARBON AT MULTIPLE SITES....................................................... 9 <br /> FIGURE 3-1. PHASED APPROACH TO TRUNK WATERMAIN CONSTRUCTION............................................. 12 <br /> FIGURE 3-2. PHASED REGIONAL WATER SYSTEM WITH A WTP IN RAMSEY.............................................. 13 <br /> FIGURE 3-3. PHASED REGIONAL WATER SYSTEM WITH A WTP IN DAYTON.............................................. 14 <br /> FIGURE 4-1.WATER TREATMENT PLANT LOCATIONS...................................................................................22 <br /> FIGURE 8-1. 2040 CONCEPT LEVEL CAPITAL, O&M,AND LIFECYCLE ANNUALIZED COSTS................... 35 <br /> FIGURE 8-2. 2040 CONCEPT LEVEL CAPITAL, O&M,AND LIFECYCLE ANNUALIZED COSTS................... 37 <br /> List of Tables <br /> TABLE ES-1. CONCEPT LEVEL CAPITAL AND O&M COSTS FOR 2040 DEMAND.................................... ES-6 <br /> TABLE ES-2. CONCEPT LEVEL CAPITAL AND O&M COSTS FOR ULTIMATE DEMAND.......................... ES-7 <br /> TABLE 1-1. HISTORIC AND PROJECTED POPULATION AND DRINKING WATER DEMAND FOR <br /> NORTHWEST METRO COMMUNITIES................................................................................................................... 3 <br /> TABLE 1-2. ULTIMATE WATER DEMAND FOR NORTHWEST METRO COMMUNITIES................................... 3 <br /> TABLE 1-3.2040 AVERAGE AND MAXIMUM DAY DEMANDS BY COMMUNITY............................................... 4 <br /> TABLE 1-4. NORTHWEST METRO MUNICIPAL WELLS AND SUPPLY SYSTEM FEATURES.......................... 4 <br /> TABLE 2-1. PRIMARY CONSTITUENT SUMMARY............................................................................................... 8 <br /> TABLE 2-2.TOTAL ORGANIC CARBON SUMMARY AT MULTIPLE SITES....................................................... 9 <br /> TABLE 3-1. CONCEPT LEVEL COST FOR PHASE Al WATERMAIN AND BOOSTER STATIONS WITH WTP <br /> INRAMSEY............................................................................................................................................................. 15 <br /> TABLE 3-2. CONCEPT LEVEL COST FOR PHASE A2 WATERMAIN AND BOOSTER STATIONS WITH WTP <br /> INDAYTON............................................................................................................................................................. 16 <br /> TABLE 3-3. CONCEPT LEVEL COST FOR PHASE B WATERMAIN AND BOOSTER STATIONS................... 17 <br /> TABLE 3-4. CONCEPT LEVEL COST FOR PHASE C WATERMAIN AND BOOSTER STATION.................... 18 <br /> TABLE 3-5. CONCEPT LEVEL COSTS FOR PHASE D1 WATERMAIN AND BOOSTER STATION................. 19 <br /> TABLE 3-6. CONCEPT LEVEL COST FOR PHASE D2 WATERMAIN AND BOOSTER STATION................... 20 <br /> TABLE 3-7. 2040 BOOSTER STATION O&M COSTS..........................................................................................20 <br /> TABLE 3-8. ULTIMATE BOOSTER STATION O&M COSTS................................................................................ 20 <br /> TABLE 4-2. CONCEPT LEVEL COST FOR 25 MGD SURFACE WATER TREATMENT PLANT....................... 23 <br /> TABLE 4-3. CONCEPT LEVEL COST FOR 50 MGD SURFACE WATER TREATMENT PLANT EXPANSION.23 <br /> TABLE 4-4.ANNUAL OPERATION AND MAINTENANCE COSTS FOR SURFACE WTPS..............................24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.