My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/19/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 10/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:01 AM
Creation date
5/23/2024 10:46:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3-1.Concept Level Cost for Phase Al Watermain and Booster Stations with WTP in Ramsey. <br /> Item Quantity Units Unit Cost Total Cost <br /> New Water Main <br /> 36" Open Cut DIP 517000 Feet $500 $25500,000 <br /> Lateral Benefit 257000 Feet ($200) ($570003000) <br /> 36" Jacked Road/River 2 000 Feet $4 000 $8 000 000 <br /> Crossing ' <br /> 24" Open Cut DIP 6,900 Feet $400 $27 760,000 <br /> Booster Stations <br /> 15 MGD (Rogers, 1 Each $2 500 000 $2 500 000 <br /> Dayton) ' <br /> 10 MGD (Rogers, 1 Each $2 000 000 $2 000 000 <br /> Dayton High Zone) ' <br /> 2 MGD (Dayton High 1 Each $800 000 $800 000 <br /> Zone) ' <br /> Easements/Land 300 000 Square $6 $1 800 000 <br /> Acquisition Feet ' <br /> Environmental 11 Miles $50,000 $5503000 <br /> Subtotal $38,9105000 <br /> Contingency (30%) $117007000 <br /> Eng/Admin/Legal $10 100 000 <br /> (20%) ' <br /> Total Phase Al $6190005000 <br /> 3.5 Phase A - Scenario 2 Wa termain — WTP in Dayton <br /> Phase A, Scenario 2 (Phase A2)watermain with the WTP in Dayton consists of a 36" backbone <br /> watermain connecting the Ramsey, Dayton, and Rogers water systems. The WTP would provide water <br /> directly to the Dayton northern pressure zone at HGL 1060 and the southern pressure zone at HGL <br /> 1110. The WTP would also provide water directly to Ramsey at an HGL of 1030. Booster stations <br /> would be provided on the 36" watermain to the west to provide water to the Dayton southern zone at <br /> HGL 1110 and Rogers at HGL 1080. The Phase A2 watermain and infrastructure is shown on Figure 2 <br /> in Appendix C. <br /> Page—15 1 METROPOLITAN COUNCIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.