My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/19/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 10/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:01 AM
Creation date
5/23/2024 10:46:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3-3 provides a concept level cost for Phase B. <br /> Table 3-3.Concept Level Cost for Phase B Watermain and Booster Stations. <br /> Item Quantity Units Unit Cost Total Cost <br /> New Water Main <br /> 16" Open Cut DIP.EM 9,900 Feet $250 $21475,000 <br /> Lateral Benefit 5,000 Feet ($200) ($1,000,000) <br /> 16" Jacked Road 100 Feet $800 $80,000 <br /> Booster Stations _ <br /> 5 MGD Expansion 1 Each $1 000 000 $1 000 000 <br /> (Rogers) ' <br /> 5 Expansion MGD 1 Each $1 000 000 $1 000 000 <br /> (Corcoran) ' <br /> Easements/Land 10 000 S uare Feet $6 $60 000 <br /> Acquisition q ' <br /> Environmental 2 Miles $50,000 $100,000 <br /> Subtotal $3,7159000 <br /> Contingency (30%) $1,100,000 <br /> Eng/Admin/Legal $960 000 <br /> (20%) ' <br /> Total Phase B $5,8009000 <br /> 3.7 Phase C— Extend 36" Watermain to Corcoran <br /> Phase C consists of extending the 36" watermain from Dayton to Corcoran. The 36"watermain would <br /> serve Corcoran's ultimate water demand of 22 MGD. A booster station is required to take the water <br /> from Dayton at an HGL of 1110 and provide it to Corcoran at an HGL of approximately 1130. The <br /> Phase C watermain and booster station are shown on Figure 4 in Appendix C. The Phase C watermain <br /> would be constructed when Corcoran's demands exceed the 2 MGD being provided by the Phase B <br /> watermain. The ultimate demands for the remaining communities would be met by the Phase D <br /> Scenario 1 or Scenario 2 watermain discussed in Sections 3.8 and 3.9. <br /> Page—17 1 METROPOLITAN COUNCIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.