My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/19/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 10/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:35:01 AM
Creation date
5/23/2024 10:46:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 8-1.2040 Concept Level Capital,O&M,and Lifecycle Annualized Costs <br /> 2040 Concent Level Capital Costs <br /> SIVI <br /> 5200 <br /> 9 P Ila Se C CJ St SVE, <br /> Phase B F�5t Sy <br /> Z� <br /> it P4astc.-A DP s i S�. <br /> OWTIPand Wells <br /> Arpproa(b I Appmach 2 APPMaCh 3 Aprproadi 4 <br /> S-LJO,I-Q Wat�r Gfoundwatef Conjunctive Use Status Quo <br /> Regional VVTP Reglonai WTP <br /> 2040 Concept Level O&M Costs <br /> 0 Boost or Station <br /> Mm <br /> Ion <br /> Repair&Repllace <br /> a WTP/VVe$11 <br /> fn 52 a WTP/we 11 m m <br /> o <br /> Approad)I Approach 2 Approach 3 Approach 4 <br /> �Ljrfa�e Waie-F Groundwater C-Gil I L J m-tive U 5* $tat U5 Quo <br /> Regional VVTP Re&nal WTP <br /> 2040 Concept Level Annualized Costs <br /> S 30 <br /> $2S 8 T01a;O&M <br /> $20 Costs <br /> S15 <br /> a An ritial Ized <br /> -E 510 Capital Cost <br /> (20 Year) <br /> $0 <br /> Approach 1 Approach 2 Approach 3 Approach 4 <br /> Surface Walef Groundwaret COPINOCtiVe VSe Status Quo <br /> Regional WTP Regional VVTP <br /> Page—35 METROPOLITAN COUNCIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.