Laserfiche WebLink
Figure 8-1.2040 Concept Level Capital,O&M,and Lifecycle Annualized Costs <br /> 2040 Concent Level Capital Costs <br /> SIVI <br /> 5200 <br /> 9 P Ila Se C CJ St SVE, <br /> Phase B F�5t Sy <br /> Z� <br /> it P4astc.-A DP s i S�. <br /> OWTIPand Wells <br /> Arpproa(b I Appmach 2 APPMaCh 3 Aprproadi 4 <br /> S-LJO,I-Q Wat�r Gfoundwatef Conjunctive Use Status Quo <br /> Regional VVTP Reglonai WTP <br /> 2040 Concept Level O&M Costs <br /> 0 Boost or Station <br /> Mm <br /> Ion <br /> Repair&Repllace <br /> a WTP/VVe$11 <br /> fn 52 a WTP/we 11 m m <br /> o <br /> Approad)I Approach 2 Approach 3 Approach 4 <br /> �Ljrfa�e Waie-F Groundwater C-Gil I L J m-tive U 5* $tat U5 Quo <br /> Regional VVTP Re&nal WTP <br /> 2040 Concept Level Annualized Costs <br /> S 30 <br /> $2S 8 T01a;O&M <br /> $20 Costs <br /> S15 <br /> a An ritial Ized <br /> -E 510 Capital Cost <br /> (20 Year) <br /> $0 <br /> Approach 1 Approach 2 Approach 3 Approach 4 <br /> Surface Walef Groundwaret COPINOCtiVe VSe Status Quo <br /> Regional WTP Regional VVTP <br /> Page—35 METROPOLITAN COUNCIL <br />