Laserfiche WebLink
,Mr.Bruce Westby,PE <br /> n <br /> December 16,2016 <br /> Page 3 <br /> Analysis <br /> Upon completion of the field review, SEH will compile crash history information for the most recent S years of <br /> available data(through the City and County and also through the State of Minnesota's crash website). SEH has <br /> already performed an updated AM and PM peak hour traffic count(7-9 am and 4-6 pm)at the intersection as part of <br /> nearby flashing yellow arrow analysis for the County and will use this information in order to determine current <br /> traffic patterns and peak hour intersection usage. <br /> Using existing signal plans,site review information,and data compiled for this intersection, SEH will perform a <br /> brief but detailed analysis of the signal system to determine which movements are able to be upgraded to flashing <br /> yellow arrow operations. A preliminary cost estimate will also be prepared for the City to determine estimated costs <br /> to upgrade the individual signal system to have flashing yellow arrow operations. Equipment required to be <br /> upgraded will be briefly listed for City information and consideration. <br /> A letter report will be prepared for City(and County)review and consideration that will include: <br /> • Analysis of traffic counts to determine potential time of day implementation of flashing yellow arrow <br /> operations, <br /> • Work recommended to be completed at this intersection, <br /> ■ Limitations on implementation of flashing yellow arrow operations, <br /> • Overall intersection estimated costs to upgrade to flashing yellow arrow operations, <br /> Final FYA Design <br /> As part of this analysis,no final design services for signal modifications are included in the proposed scope of work. <br /> If requested, SEH can provide the City with estimated design and construction administration costs for construction <br /> of FYA improvements for City consideration and budgeting. SEH can also provide the City with a separate <br /> proposal which would include all design,bidding,and construction observation services needed to fully implement <br /> the construction of these improvements. <br /> Schedule <br /> SEH proposes to begin work after a Notice-To-Proceed is issued by the City. We will complete a field review of the <br /> intersection in January--February 2017 and provide the City and County with our analysis findings by March 1,2017. <br /> Compensation <br /> The proposed work program includes a detailed field review of the signal system,analysis and report preparation. <br /> We propose to be paid for the work we do on an hourly basis based on direct labor costs,plus the actual cost of <br /> reimbursable expenses. <br /> The field review,intersection analysis,and report preparation work,as defined above,will be done on an hourly <br /> basis(plus reimbursable expenses)for a cost-not-to-exceed of$1,700. These costs will not be exceeded except as <br /> otherwise approved by the City. <br /> Any additional tasks added to or deleted from this project(due to significant changes in the general scope of the <br /> project or its design including,but not limited to,changes in size,complexity of character or type of construction) <br /> shall be by written amendment to the contract signed by both parties. <br />