My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:19:17 AM
Creation date
6/3/2024 1:37:24 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
785
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> Fees Payable to the City <br /> 1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park <br /> Dedication Fee requirements. PERMITTEE must pay a Park Dedication Fee of <br /> $121,500.00 (27units x $4,500.00 per unit). The PERMITTEE acknowledges that these <br /> fees are estimates. The rate in effect when the Plat is recorded will be collected. <br /> 2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br /> Development Fee requirements. PERMITTEE must pay a Trail Development Fee of$ <br /> 40,500.00 (27 units x$1,500.00 per unit). The PERMITTEE acknowledges that these fees <br /> are estimates. The rate in effect when the Plat is recorded will be collected. <br /> 3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br /> applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary <br /> Sewer Trunk Fee of$36,423.00 (27 units x $1,349.00). The PERMITTEE acknowledges <br /> that these fees are estimates. The rate in effect when the Plat is recorded will be collected. <br /> 4. Water Connection(Trunk)Fees. The PERMITTEE is responsible for satisfying applicable <br /> Water Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of$54,243.00 <br /> (27 units x $2,009.00 per unit). The PERMITTEE acknowledges that these fees are <br /> estimates. The rate in effect when the Plat is recorded will be collected. <br /> 5. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br /> Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management <br /> Fee of$14,418.00 (27 units x $534.00 per unit). The PERMITTEE acknowledges that <br /> these fees are estimates. The rate in effect when the Plat is recorded will be collected. <br /> 6. COR Stormwater Basin Contribution. The PERMITTEE is responsible for paying <br /> $27,677.50 to contribute to the costs of the regional stormwater basin in lieu of providing <br /> on-site stormwater basins. This amount covers the current phase and future phases within <br /> Outlot C. <br /> 7. Street Sign Fee. While the CITY provides and installs the street name and traffic control <br /> signage,the PERMITTEE is responsible for paying for them at a rate of$265.00 per sign. <br /> PERMITTEE must pay a Street Sign Fee of$ 2,385.00 (4 x 265 street name signs; 1 x $ <br /> 265.00 no parking signs; 4 x $ 265.00 stop signs). <br /> 8. Development Fees for the Outlots. The PERMITTEE acknowledges that development <br /> fees are not being collected for any Outlots. The PERMITTEE acknowledges that <br /> development fees will be due upon development of any of the Outlots. The rate in effect <br /> at the time said future plat(s) is recorded will be collected. <br /> 9. Contribution to Ramsey Parkway Construction. The PERMITTEE will contribute <br /> $256,600.00 towards the construction costs of Ramsey Parkway per the signed purchase <br /> agreement. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.