Laserfiche WebLink
MnDOT Contract No.: 1056358 <br /> be revoked by the State at any time, with or without cause. Cause for revoking this right of occupancy <br /> includes, but is not limited to, breaching the terms of this or any other agreement (relevant to this Project) <br /> with the State, failing to provide adequate traffic control or other safety measures, failing to perform the <br /> construction properly and in a timely manner, and failing to observe applicable environmental laws or <br /> terms of applicable permits. The State will have no liability to the City (or its contractors or consultants)for <br /> revoking this right of occupancy. <br /> 2.2. State Access;Suspension of Work;Remedial Measures. The State's District Engineer or assigned <br /> representative retains the right to enter and inspect the Trunk Highway Right-of-Way(including the <br /> construction being performed on such right-of-way) at any time and without notice to the City or its <br /> contractor. If the State determines (in its sole discretion) that the construction is not being performed in a <br /> proper or timely manner, or that environmental laws (or the terms of permits) are not being complied <br /> with, or that traffic control or other necessary safety measures are not being properly implemented,then <br /> the State may notify and require the City (and its contractors and consultants)to suspend their operations <br /> until the City (and its contractors and consultants)take all necessary actions to rectify the situation to the <br /> satisfaction of the State.The State will have no liability to the City (or its contractors or consultants)for <br /> exercising or failing to exercise its rights under this provision. <br /> 2.3. Traffic Control; Worker Safety. While the City(and its contractors and consultants) are occupying the <br /> State's Trunk Highway Right-of-Way,they must comply with the approved traffic control plan, and with <br /> applicable provisions of the Work Zone Field Handbook <br /> (http://www.dot.state.mn.us/trafficeng/workzone/index.html). All City, contractor, and consultant <br /> personnel occupying the State's Trunk Highway Right-of-Way must be provided with required reflective <br /> clothing and hats. <br /> 2.4. State Ownership of Improvements. The State will retain ownership of its Trunk Highway Right-of-Way, <br /> including any improvements made to such right-of-way under this Agreement, unless otherwise noted. <br /> The warranties and guarantees made by the City's contractor with respect to such improvements (if any) <br /> will flow to the State.The City will assist the State, as necessary,to enforce such warranties and <br /> guarantees, and to obtain recovery from the City's consultants, and contractor(including its sureties)for <br /> non-performance of contract work,for design errors and omissions, and for defects in materials and <br /> workmanship. Upon request of the State, the City will undertake such actions as are reasonably necessary <br /> to transfer or assign contract rights to the State and to permit subrogation by the State with respect to <br /> claims against the City's consultants and contractors. <br /> 3. Contract Award and Construction <br /> 3.1. Direction,Supervision, and Inspection of Construction. <br /> A. The contract construction will be under the direction of the City and under the supervision of a <br /> registered professional engineer; however, the State participation construction covered under this <br /> Agreement will be open to inspection by the State District Engineer's authorized representatives.The <br /> City will give the District Engineer at Roseville five days' notice of its intention to start the contract <br /> construction. <br /> B. Responsibility for the control of materials for the contract construction will be on the City and its <br /> contractor and will be carried out according to Specifications No. 1601 through and including No. 1609 <br /> in the State's current "Standard Specifications for Construction". <br /> 3.2. Completion of Construction. The City will cause the contract construction to be started and completed <br /> according to the time schedule in the construction contract special provisions.The completion date for the <br /> contract construction may be extended, by an exchange of letters between the appropriate City official <br /> -2- <br /> Construction within State R/W& Maintenance (Cooperative Agreements) <br />