My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:19:17 AM
Creation date
6/3/2024 1:37:24 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
785
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
correction to help keep water out of the subbase material. The new pavement section placed on top of this is <br /> proposed to be 8-inches of aggregate base below 3.5-inches new bituminous pavement. <br /> The reconstruction process is similar to the FDR process except the excavation depth will be approximately <br /> 18-inches rather than 3-inches. The material is not considered clean because it contains silt and clay, and will <br /> become property of the Contractor. The geotextile fabric is placed to separate the poor underlying soils from the <br /> aggregate base. The extra aggregate base thickness along with the 1-foot of sand build additional strength to help <br /> the pavement bridge the poor soils. During construction,the Contractor will only sub-cut out what they can <br /> backfill to aggregate base by the end of the work day. On similar projects this has been 300 to 400 feet per day. <br /> Preliminary Schedule Remaining <br /> •Council awards contract to the lowest responsible bidder <br /> o May 28, 2024 <br /> o Coordinating award with the City of Nowthen <br /> •Contractor begins construction <br /> o On or around July 1, 2024 (dependent on Contractor's schedule) <br /> • Substantial Completion <br /> o September 30, 2024 <br /> o Final lift of bituminous pavement in-place,boulevard restoration in-place <br /> •Final Completion <br /> o June 30, 2025 <br /> o Verify final turf establishment,project clean up complete <br /> o Not enough time in the fall for turf establishment to take place after the substantial completion date. <br /> The proposed improvements are designated as City Improvement Project#24-03, 2024 NE Ramsey Street <br /> Reconstructions. <br /> Notification: <br /> If Council accepts the bids and awards a contract for construction of the improvements, letters will be mailed to <br /> property owners with updates on the project status. Engineering Staff maintains City Improvement project <br /> webpages with the most current project information under the Engineering Department webpage on the City's <br /> website. <br /> Time Frame/Observations/Alternatives: <br /> Timeframe: <br /> Staff estimates up to 10 minutes will be needed to present this case and respond to questions. <br /> Alternatives: <br /> Alternative#1 —Motion to adopt Resolution#24-13 9 accepting bids and awarding a contract for 2024 NE <br /> Ramsey Street Reconstructions, Improvement Project#24-03, to GMH Asphalt Corporation for the total bid in the <br /> amount of$2,441,039.52. <br /> Alternative#2—Motion to adopt Resolution#24-139 accepting bids and awarding a contract for 2024 NE <br /> Ramsey Street Reconstructions, Improvement Project#24-03, to GMH Asphalt Corporation for the base bid in the <br /> amount of$2,034,319.94. <br /> Alternative#3—Motion of other. <br /> Funding Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.