My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 05/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:19:17 AM
Creation date
6/3/2024 1:37:24 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
785
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 6. <br /> CC Regular Session <br /> Meeting Date: 05/28/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title <br /> Adopt Resolution#24-123 Approving Plans and Authorizing Advertisements for Bids for Improvement Project <br /> #24-04, Ford Brook Estates Drainage Improvements <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-123 approving plans and specifications and authorizing <br /> advertisements for bids for Improvement Project#24-04, Ford Brook Estates Drainage Improvements. <br /> Background: <br /> For several years the residents at 5725 180th Lane NW have voiced concerns with stormwater runoff that backs <br /> up into their property from the drainage ditch in City right-of-way north of 180th Lane NW. They first shared <br /> these concerns with Staff during the design and construction of the 2019 City Improvement Project#19-01, Ford <br /> Brook Estates Street Reconstructions,which addressed only minor drainage improvements as part of the street <br /> reconstruction project. After the project was complete, Staff informed the property owners that if they wanted the <br /> City to address their larger drainage concerns Staff could explore drainage improvement options and present them <br /> to the Public Works Committee for consideration of further action. <br /> On September 19, 2023, Staff presented attached case#14569 to the Public Works Committee including <br /> preliminary design plans that proposed construction of an underground storm sewer system North of 180th Lane <br /> and West of Highway 47 to convey stormwater runoff collected within drainage ditches along both sides of 180th <br /> Lane and Krypton Street, and also from the low-lying area partially within MnDOT right-of-way on the West side <br /> of Highway 47 and partially on the East side of the property at 18013 Krypton Street,to an outlet to the Ford <br /> Brook in the City of Nowthen. <br /> The proposed drainage improvements provide positive drainage to prevent stormwater runoff from temporarily <br /> ponding near the Southeast corner of the property at 5725 180th Lane NW and backing up into the yard through a <br /> swale in the front yard. And as directed by the Public Works Committee, improvements are proposed to provide <br /> an outlet for stormwater runoff that temporarily ponds West of Highway 47 on the East side of the property at <br /> 18013 Krypton Street NW. It should be noted that no right-of-entry or easements will be required for this work as <br /> MnDOT right-of-way along Highway 47 is 120 feet wide so all storm sewer along Highway 47 can be constructed <br /> within MnDOT right-of-way, and the low-lying area East of 18013 Krypton Street extends into MnDOT <br /> right-of-way. <br /> Preliminary Project Schedule <br /> November 14, 2023 City Council authorized preparation of plans and specifications and awarded topographic <br /> survey proposal <br /> Jan—May 2024 Staff prepared plans and specifications <br /> City Council awards geotechnical evaluation proposal <br /> May 28,2024 City Council approves plans, authorizes bidding <br /> July 1, 2024 Bid opening <br /> July 9, 2024 City Council awards construction contract <br /> July 2024 Begin construction <br /> August 31, 2024 Substantial completion <br />
The URL can be used to link to this page
Your browser does not support the video tag.