Laserfiche WebLink
PAY ESTIMATE #9, FINAL <br /> CITy OF RAMSEY <br />SUNWOOD DRIVE NW <br />UTILITY AND ~;TREET IMPROVEM~ <br /> IMPRGVEMENT P F[OJECT NO. 911,~$2 <br /> <br />HO. ~07 P. 4/B <br /> Engineer <br /> <br />Bid Schedule "B" - Ramsay Local Funding <br /> <br />Ram Description 1 6" Du.'tile Iron Pipe Sewer C3 52 <br /> <br /> 2 12" Duo-'file Iron Pice Sewer C152 <br /> 3 6" SDR 26 PVC Pipe (AIl Depths) <br /> <br /> 4 B" SDR 35 PVC Pipe {Alt Depths) <br /> <br /> 5 8" X 5" PVC Wya - SDR 26 <br /> <br /> 6 6" PVC Plug <br /> <br /> 7 8" PVC Plug <br /> <br /> 8 Sanitary Sewer Inspectlan <br /> <br /> 9 Ductile Iron Fittincjs <br /> <br /> 10 Eelocate Hydrant <br /> <br /> 11 Connect to Existing Watarmain <br /> 12 Hydrant <br /> <br /> 13 6" Gate Valve and Box <br /> <br /> 14 10" Gate Valve and Box <br /> <br /> 15 12' Gate Valve and Box <br /> <br /> 17 Casting Assemblies Tyl~e 2 <br /> <br /> 15 Construct Sanitary Manhole <br /> <br /> 10 Extra Depth Manhole (over 8') <br /> <br />Tatal Bta Schedule "B" - Ramsay Local F-ndtng <br /> <br /> Est[mated <br /> Quantity Contract Ur it Pric~ Amount ~s=d m D~ E~nsion <br /> 508 LF ~5.70 ~ LF $ 7,975,60 506 $ <br /> <br />~BS LF ~24.70 I ~ ~ 63,849.50 26~0 ~ <br /> 319 LF S8.50 LF $ 2,7~ 1,50 319 $ <br /> <br />1843 LF $13.80 LF $ 22.67~.40 164~ $ ~.~.~ <br /> <br />7 ~CH $58.00 : ~ ~CH $ 408.00 7 $ 408.00 <br />7 ~CH $12.~D ~CH $ 88,20 7 $ 88.20 <br />2 ~CH $23.70 EACH $ 47.40 2 $ 47.40 <br />1595 LF $1.00 LF $ 1.595.00 1595 $ <br />6880 LB $1.20 LB $ 8,258.00 4113 $ 4,935.6~ <br />1 ~OH $1,6~2,10 ~CH $ 1,63~10 1 $ 1,632.10 <br /> 2 ~CH $1,961.30 EACH $ 3.~2.~ 2 $ 3.922.60 <br /> 5 ~CH $1,599.90. ~CH $ 7,999.50 5 $ 7,990.50 <br /> <br /> 13 ~CH ~89.80 ~CH S 8,364.80 13 $ 6.364.80 <br /> I ~CH ~50.00 '~CH ~ 950.00 2 $ 1.900.00 <br /> <br /> 4 ~CH $~,164.80 ~CH $ 4.859.20 4 $ 4~S5~.20 <br />10.7 SY $18.30 SY $ 195.81 11 $ ~01.30 <br />B ~CH $419.30 ~CH S 3,354.4~ 8 $ 3.354.40 <br />8 ~CH $1,217.90 EACH $ 9.7~.20 8 $ 9,743.2D <br /> <br />147,520.96 <br /> <br />Bid Schedule "C" - Mobilization and T~fflc Control <br /> <br />Item Descriofien <br /> I MobMzaflon <br /> 2 Traffi~ Cenb'ol <br /> <br />Tatal Bid Schedule "C' - Mob(liza~on and Traffic Car~trol <br /> <br />Estimated <br />Quantify Contract U~ ,t Pric~ AmoaDt U~d m D~ Extension <br />1 LS $21.451.00[ LS $ 21.481])0 1 $ 21,461.00_ <br />1 LS $2,000.00! LS $ 2,000.00 I $ 2.000.00 <br /> <br />$ 23,461.00 $ 23,461.0O <br /> <br /> <br />