My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 06/27/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:05:39 PM
Creation date
6/23/2006 2:04:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIAL PAY ESTIMATE NO. 3 <br /> <br />Date: June 6, ~006 <br />project: Ebony Street and Utility Improvements 05-23 <br />Contractor: W B Miller Inc. <br />Current Contract Amount: $255,91;L05 <br />Award Date: August 23, 2005 <br />The following work h~ been completed on the above referenced project: <br /> <br />item Description <br /> <br />Qnty Unit Unit price <br /> <br />ExtensiOn <br /> <br />1 MobiJizatio¢~ 1 is 7000.00 $ 7,000.00 <br />2 Traffic bontrol I Is 1300.00 $ 1,300.00 <br />3 Sawcut Bit. 638 ft 3.15 $ 2,009.70 <br />4 Remove C & G 605 ft ·3.15 $ 1,905.75 <br />5 Remove Bit pvmnt 5320 sc~ yd 4.00 $ 21,280.00 <br />6 Connect to San Sewer 1 Is 525.00 $ 525.00 <br />7 8in San sewer 434 ff 14.00 $ 6,076.00 <br />8 48 in san MH 1 ea 2265.00 $ 2,265.00 <br /> 4 ea 52.00 $ 208.00 <br />9 8 X4 wye 63.00 $ 126.00 <br />10 8 X 6 wye 2 ea <br />11 4 in Service pipe 131 ft 17.60 $ 2,305.60 <br />12 6 in service pipe 78 ft 18.00 $ 1,404.00 <br />13 Connect towatermain 2 ea 520.00 $ 1,040,00 <br />14 8 in DIP 938 ff 25.85 $ 24,247.30 <br />15 Hydrant w/vaNe 1 ea 2825.00 $ 2,825.00 <br />16 8 in gate valve I ea 860.00 $ 860.00 <br />17 1 in copper service 215 ft 12.50 $ 2,687.50 <br />18 1 in curb stop w~ox 4 ea 100.00 $ 400.00 <br />19 4 in DI service pipe 116 ft 21.00 $ 2,436.00 <br />20 4 in Yalve w/box 2 ea 550.00 $ 1,100.00 <br />21 DI figs 1050 lbs '~.48 $ 1,522.50 <br />22 Crass 5 963 tn 0.10 $ 96.30 <br />23 Bit Base course 526 tn 35.35 $ 18,594.10 <br />24 BitWear course 380 tn 35.35 $ 13,433.00 <br />25 Conc C&G 2583 ff 10.20 $ 26,346.60 <br />26 2X3 CB 2 ea 1525.00 $ 3,050.00 <br />27 72 in Stm MH 2 ea 3175.00 $ 6,350.00. <br />28 60 in Stm MH 3 ea 2400.00 $ 7,200.00 <br />29 18in RCP pi~e 450 ft 30.00 $ 13,500.00 <br />30 24in RCP pipe 68 ft 36.00 $ 2,448.00 <br />31 27 [n P. CP ~ipe 33 ft 44.00 $ 1,452.00 <br />32 Water Quality Treat System 1 Is 41,300.00 $ 41,300.00 <br />33 Conc sidewalk 521 sq yd 33,55 $ 17,479.55 <br /> 475.00 $ 1,900.00 <br />34 Conc ped ramp 4 ea 1.00 $ 210.00 <br />35 Topsoil borrow 210 cu yd <br /> <br />-85- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.