My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 06/27/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:05:39 PM
Creation date
6/23/2006 2:04:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REO'D1 1 2006 <br /> <br />Change. Order Ne;~: <br />Date: May 3, 2006 <br />Project: 05-23 Ebony Street Sewer Water and Street Improvements <br />Owner: City of Ramsey <br />Contractor: W B Miller Inc. <br /> <br />Contract Modifications: <br /> <br />Realign Pipe into Catchbasin No 4 <br />Description of Change: This project was bid with Catchbasin No 4 needing to be <br />reconstructed three feet to the west because oft. he relocation of the curbline. This existing <br />catchbasin had an additional lead connected into it from a storm project that was <br />performed by the Superbowl. This additional lead needed to be reconnected into the <br />relocated catchbasin. <br />Justification of Change: This work was needed to be done to have the storm sewer <br />function properly and provide an outlet for the storm water pond.Lng system of the <br />Superbowl. The additional work was not anticipated at the time the contract documents <br />were prepared. <br />Cost of Change: The cost of this additional work is 2 hrs of crew time @ $600 per hr or <br />$1,200. <br /> <br />Removal of Buried Structure <br />Description of Change: During the course of excavating for the installation of~e water <br />quality treatment structure on I37th-Lane, a buried manhole structure w~s discovered <br />bob/nd the curb adjacent to an electrical transformer box. It was necessary to remove, <br />dispose, and sheet next to the electrical box. <br />Justification of Change: This work resulted from a change in anticipated conditions <br />Cost of Change: The cost of this additional work is 2 hrs of crew time ~ $600 per hr or <br />$1,200. <br /> <br />Relaying of CBMH No 7 <br />Description of Change: The plan sheet had an error which reversed the inverts of the <br />southeast inlet and the west inlet. This was not discovered until the manhole had been set <br />and several lengths of pipe had been layed in the field. A.s a result it was necessary to <br />reorder a corrected section of manhole barrel and relay pipe. <br />Justification of Change: The error was in the plans and not the responsibility of the <br />contractor. <br />Cost of Change: The cost of this additional work is 4 hfs of crew time ~ $600 per hr or <br />$2,400. In addition the cost of restocking the section of manhole barrel was $1,537 for a <br />total cost of $3,937. <br /> <br />-87- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.