My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/27/2024
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2024
>
Agenda - Planning Commission - 06/27/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:30:56 AM
Creation date
7/1/2024 8:31:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECTURAL NARRATIVE FOR TAKE 5 OIL — RAMSEY, MN <br />CUP Submittal <br />Codes and Standards: <br />The following codes and standards will apply to this project. <br />• 2018 International Building Code <br />• 2020 MN Building Code <br />• 2020 Accessibility Code <br />• 2024 MN Energy Code <br />• 2020 NEC Code <br />Program <br />Take 5 offers fast, friendly, simple oil changes while you stay in -your -car. You'll be in and out in 10 <br />minutes. You'll get free water, tire check, and fluid top off. This facility will incorporate 3 drive-thru <br />bays for your oil change. One of those bays will have a lift capability to do tire rotations. <br />Take 5 is not an auto repair shop nor is it the intent to turn into that. <br />Site Plan <br />Phase 1 will include the Take 5 facility with a future restaurant development in Phase 2. Take 5 facility <br />will coordinate with the future Aldi site to create a cohesive, convenient, and efficient site plan. <br />Twelve (12) parking spots will be included as part of the Take 5 development with one (1) being an ADA <br />stall. Parking along the Northstar mall is being provided as part of the purchase agreement. <br />One trash enclosure 10' wide x 12' deep will be provided using rock -faced CMU block to enclose it. The <br />CMU will match the color of the brick on the main Take 5 building. <br />Plan <br />The plan is a 30' wide x 62' long building (1,860 SF). The majority of the facility is (3) drive thru bays, but <br />will also include a toilet, an office, and a storage room. <br />Once a week an oil truck will fill the South side oil tanks and every other week an oil truck will remove <br />the waste from the North side. These are typically done during off hours, so as to not impede traffic and <br />business operations. <br />Exterior Elevations <br />The design of the exterior will include face brick, EIFs, a precast band, aluminum canopy, pre -finished <br />metal coping, and signage. See architectural exterior elevations for colored elevation renderings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.