My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 06/25/2024
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2024
>
Agenda - Council Work Session - 06/25/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:22:47 AM
Creation date
7/1/2024 12:45:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
06/25/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Inspection Schedule Changes <br />Changes to the Inspection schedule should not generally be made after 8am of the <br />business day. If changes are needed after that, or if same day inspections are <br />necessary, inspectors will be contacted by text or phone as soon as possible to <br />confirm they are aware of any inspection schedule changes. The field inspector is <br />requested to respond as soon as possible to the message (phone or text) so the <br />person initiating the change is aware that the information was received. <br />4. Scheduling Inspections <br />Scheduling inspections requires balancing the availability of our inspectors and <br />keeping construction projects on schedule. Our literature should state; "provide at <br />least 2 to 3 days' notice for inspection requests." Sometimes people forget or do not <br />realize the statement was included with their permit documents. If an inspection is <br />requested with less lead time, remind the caller that 2 to 3 days is most often <br />needed to ensure quality service for everyone. Try to resist scheduling with shorter <br />notice while still being as accommodating as possible. Emergency situations are to <br />be determined on a case by case basis. <br />5. Re -inspections Fees <br />To maintain quality service for our customers while monitoring resources, no more <br />than one reinspection is allowed per permit/trade without the potential of incurring <br />additional fees. After one reinspection has been provided, remind the applicant that <br />each additional reinspection is subject to this provision. This amount should be <br />confirmed by the fee schedule to ensure it is aligned with the actual time needed for <br />the administration of additional services (this includes both field time and office staff) <br />6. Permit Extension Request <br />The building official (or designee)shall grant, in writing, extensions of time, for <br />periods not more than 180 days each if the applicant demonstrates justifiable cause. <br />This request is to be in writing from the applicant. <br />Operations Manual 2024 Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.