My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/25/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 06/25/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:22:13 AM
Creation date
7/1/2024 12:56:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/25/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETED TO DATE <br />Extended Total I <br />CO <br />N <br />r <br />CO <br />r <br />69 <br />CO <br />CO <br />o <br />co <br />O <br />r <br />69 <br />$ 4,923.101 <br />O <br />CO <br />r <br />r <br />O <br />N <br />63 <br />$ 1,217.28 <br />$ 1,352.551 <br />V <br />CO <br />Ci <br />O <br />r <br />r <br />ER <br />O <br />a0 <br />00 <br />(0 <br />63 <br />69- <br />0) <br />r <br />(o <br />V <br />r <br />r <br />0) <br />0) <br />(3) <br />(o <br />co <br />CO <br />6) <br />ER <br />6) <br />N <br />co <br />ai <br />p <br />C) <br />E) <br />M <br />6) <br />C <br />7 <br />N <br />r <br />LLD <br />V' <br />r <br />O <br />r <br />r <br />O <br />N <br />`-• <br />CD7 <br />O <br />O <br />COMPLETED THIS PERIOD <br />Extended Total <br />$ 1,817.76 <br />CO <br />CO <br />O <br />CO <br />O <br />N_ <br />69 <br />O <br />r <br />C) <br />N <br />6) <br />t} <br />69 <br />O <br />CO <br />10 <br />10 <br />O <br />N <br />6) <br />$ 1,217.28 <br />O <br />O <br />N <br />O <br />CO <br />r <br />69 <br />V <br />CO <br />C) <br />O <br />r <br />r <br />ER <br />O <br />CO <br />N <br />CA <br />69 <br />6) <br />$ 1,146.75 <br />O <br />O) <br />O <br />CO <br />CO <br />ER <br />69 <br />EA <br />$ 350,409.32 <br />Quantity <br />N <br />cc, <br />( <br />.� <br />r <br />O <br />, <br />CDN <br />CA <br />r <br />O <br />O <br />O <br />CONTRACT AMOUNT <br />Extended Total <br />Unit Price <br />SY 22 $ 75.74 <br />SY 8 $ 75.74 <br />SY 58 $ 75.74 <br />SF 32 $ 51.94 <br />LS 1 $ 2,434.56 <br />EA 5 $ 270.51 <br />EA 11 $ 91.97 <br />LF 75 $ 2.59 <br />LF 290 $ 2.59 <br />CY 86 $ 45.87 <br />ACRE 0.13 $ 6,438.08 <br />EA 5 $ 270.51 <br />SF 120 $ 6.49 <br />Estimated <br />Quantity <br />c <br />7 <br />Item Description <br />42 2531.503 CONCRETE MEDIAN <br />43 2531.503 CONCRETE BULL NOSE <br />44 2531.604 7" CONCRETE VALLEY GUTTER <br />45 2531.618 TRUNCATED DOMES <br />46 2563.601 TRAFFIC CONTROL <br />48 2573.501 STABILIZED CONSTRUCTION ENTRANCE <br />49 2573.502 STORM DRAIN INLET PROTECTION <br />50 2573.503 SEDIMENT CONTROL LOG TYPE STRAW <br />51 2573.503 SILT FENCE, TYPE MS <br />52 2574.507 TOPSOIL (LV) <br />53 2575.501 ,TURF ESTABLISHMENT <br />54 2575.602 LANDSCAPE RESTORATION <br />55 2582.518 ICROSSWALI< PAINT (EPDXY) <br />MnDOT <br />No. <br />O <br />Z <br />E <br />O <br />COMPLETED TO DATE <br />Extended Total <br />$ 3,895.29 <br />$ 973.80 <br />N <br />CO <br />0) <br />N <br />69 <br />O <br />r <br />0 ) <br />r <br />6 <br />6) <br />O <br />O <br />v <br />O <br />OD <br />ER <br />$ 194.701 <br />$ 973.80 <br />O <br />CO <br />cam) <br />O <br />,- <br />69 <br />69 <br />69 <br />$ 241.29 <br />$ 1,609.511 <br />I $ 56,383.761 <br />GRAND TOTALS 1 $ 412,370.091 $ 406,793.081 $ 406,793.08 <br />Quantity <br />Cr) <br />O <br />86 <br />O <br />_O <br />300 <br />10 <br />N <br />Ol <br />O <br />CD1� <br />O <br />COMPLETED THIS PERIOD <br />Extended Total <br />6) <br />N <br />O <br />6) <br />CO <br />C) <br />69- <br />$ 973.80 <br />N <br />CO <br />CO <br />O <br />N <br />C) <br />69- <br />$ 9,156.75 <br />$ 35,043.00 <br />O <br />1- <br />V <br />O <br />r <br />(R <br />$ 973.80 <br />O <br />CO <br />O <br />co <br />O <br />r <br />ER <br />(R <br />i <br />ER <br />$ 241.29 <br />$ 1,609.51 <br />$ 56,383.76 <br />T <br />Y <br />a <br />EC66 <br />7 <br />0 <br />O <br />O <br />CO CO <br />O <br />CD <br />N <br />300 <br />LO <br />r <br />CD <br />N <br />CD <br />N <br />0 <br />0 <br />1� <br />O <br />CONTRACT AMOUNT <br />Extended Total' <br />Unit Price <br />EA 9 $ 432.81 <br />EA 9 $ 108.20 <br />CY 132 $ 37.87 <br />SY 1920 $ 4.35 <br />TON 280 $ 116.81 <br />EA 7 $ 12.98 <br />LF 20 $ 48.69 <br />SF 24 $ 51.94 <br />LS 1 $ 811.52 <br />LF 200 $ 2.59 <br />CY 172 $ 34.47 <br />ACRE 0.25 $ 6,438.04. <br />Estimated <br />Quantity <br />e <br />7 <br />ALTERNATIVE A TRAIL <br />Item Description <br />56 2101.502 CLEARING <br />57 2101.502 GRUBBING <br />58 2105.607 COMMON EXCAVATION (EV) <br />59 2215.504 FULL DEPTH RECLAMATION TRAIL <br />60 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 2.5" TRAIL <br />61 2521.602 DRILL & GROUT REINF BAR (EPDXY COATED) <br />62 2531.503 CONCRETE CURB & GUTTER B618 <br />63 2531.618 TRUNCATED DOMES <br />64 2563.601 ALTERNATIVE PEDESTRIAN ROUTE <br />65 2573.503 SILT FENCE, TYPE MS <br />66 2574.507 TOPSOIL (LV) <br />67 2575.501 TURF ESTABLISHMENT <br />ALTERNATIVE A (TRAIL) TOTAL <br />MnDOT <br />No. <br />O <br />Z <br />E <br />v <br />c <br />0 <br />0 <br />(0 <br />E <br />0) <br />(O <br />(r <br />cci <br />N <br />(O <br />00 <br />O <br />(h <br />69 <br />(O <br />N <br />O <br />v <br />N <br />O <br />0) <br />CO <br />co <br />00 <br />u) <br />63 <br />406.793.08 <br />63 <br />N. <br />O) <br />(b <br />N <br />(O <br />CO <br />O <br />co <br />69 <br />(O <br />(n <br />00 <br />(O <br />N <br />69 <br />O <br />00 <br />(V <br />69 <br />O <br />CO <br />CO <br />CO <br />t\ <br />to <br />69 <br />69 <br />O <br />0 <br />O <br />c <br />( <br />c <br />E <br />00 <br />(0 <br />c <br />c <br />a) <br />E <br />a <br />* PM INVOICE $4,450.00 * EXTRA WORK <br />Pay Estimate Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.