My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/25/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 06/25/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:22:13 AM
Creation date
7/1/2024 12:56:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/25/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />06/25/2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />5. 14. <br />Title <br />Adopt Resolution #24-171 Ordering Request for Proposals for Fire Station No.1 Sewer and Water Connections <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #24-171 ordering request for proposals for Fire Station No.1 sewer <br />and water connections. <br />Background: <br />In 2021, concurrent with overlaying the Fire Station No.1 parking lot, a 6-inch ductile iron water extension was <br />constructed. This extended a water service from the west side of the parking lot into the fire station's utility closet. <br />The 2-inch copper line from the on -site well remains in service, supplying water to the fire station. An existing <br />4-inch sanitary line runs parallel to the recently installed water service, and carries sewer to an existing tank <br />located just west of the parking lot. This overflows into the septic field located west of the parking lot in the green <br />space. <br />As part of the Lynwood Townhomes project, sanitary sewer and water stubs were extended to the west side of the <br />Fire Station property. The extensions were built with the 2 nd phase of Lynwood's construction, and complete in <br />2023. <br />This project proposes to complete the water and sewer extension to connect the water and sewer between the fire <br />station and the stubs placed as part of the Lynwood Townhomes project. This requires extending approximately <br />80 feet of sanitary sewer, and removing the existing septic tank and impacted drain field, as well as extending <br />approximately 95 feet of 6 inch ductile iron water service and relocating a fire hydrant and 6 inch gate valve. A <br />sketch of the proposed improvements is included in the attached draft Request for Proposal (RFP). <br />The water service is being constructed as 6-inches to accommodate the future fire station sprinkler system, <br />currently proposed as a 2024 improvement in the 2024 — 2033 Capital Improvement Program. <br />Staff proposes to return proposals to City Council at the July 23rd meeting, for consideration of awarding a <br />contract. The work is proposed to occur in August 2024. <br />Notification: <br />If City Council orders requests for proposals, City Staff will contact local companies known to perform this type <br />of work with the attached request for proposal. <br />Observations/Alternatives: <br />Observations: <br />Per the proposed request for proposals attached to this case, once a notice to proceed is given, the Contractor will <br />have 20 working days to complete this work. Additionally, the work must be initiated within 7 calendar days of <br />the notice to proceed. <br />Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.