Laserfiche WebLink
5. 9. <br /> CC Regular Session <br /> Meeting Date: 07/09/2024 <br /> Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br /> Information <br /> Title <br /> Adopt Resolution#24-124 Approving Change Order No. 20 for Ramsey Gateway Highway 10 Improvements, <br /> Improvement Project#20-11 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-124 approving Change Order No. 20 for Ramsey Gateway <br /> Highway 10 Improvements, Improvement Project#20-11. <br /> Background: <br /> In 2023, construction began on the Ramsey Gateway Highway 10 project,which includes grade separation of <br /> Highway 10 at the intersections of Sunfish Lake Boulevard and Ramsey Boulevard, frontage road improvements <br /> on both sides of Highway 10, and grade separation of the Burlington Northern Santa Fe (BNSF)railway crossings <br /> of Ramsey Boulevard and Sunfish Lake Boulevard. Construction of this project is scheduled for completion by <br /> the Spring of 2026. <br /> Numerous City utilities have been and will continue to be constructed and/or reconstructed as part of this project <br /> per the approved construction plans. However, during construction,plan revisions are sometimes required to <br /> account for unforeseen conditions in the field, or to provide for future considerations that were unknown at the <br /> time the plans were prepared and approved. <br /> Change Order No. 20 addresses such required revisions as identified in attached Change Order No. 20,which has <br /> been signed by Minnesota Department of Transportation(MnDOT)representatives and the Contractor,Ames <br /> Construction. In summary, sections of existing sanitary sewer that were proposed to be removed in the plans are <br /> instead being left in place and filled with sand and bulk-headed to avoid impacting the parking lot and landscaping <br /> of an ad j acent business,which would disrupt the business and result in significant costs for repairing their <br /> driveway. <br /> The City Engineer has reviewed and approves of the Extra Work associated with Change Order No. 20 resulting <br /> in a project cost reduction of$10,400. <br /> Notification: <br /> Notifications are not required. <br /> Observations/Alternatives: <br /> Observations: <br /> City staff reviewed and approved Change Order No. 20. <br /> Alternatives: <br /> Alternative#1 —Adopt Resolution#24-124 approving Change Order No. 20 for Ramsey Gateway Highway 10 <br /> Improvements, Improvement Project#20-11. <br />