Laserfiche WebLink
The Public Works Committee reviewed and discussed the resident's requests with them on October 19, 2021, and <br /> afterwards the committee directed.Staff to contact the developer and their engineer to determine if either or both <br /> would be willing to partner with the City to redesign,reconstruct and/or extend the noise wall to serve it's intended <br /> purpose. The Committee also directed Staff to contact MnDOT to discuss the option of relocating the wall onto <br /> their right-of-way, and to present estimated costs to reconstruct and/or extend the sound wall to the end of the plat <br /> and/or to connect to the existing wall to the north during a future meeting. <br /> Staff then contacted the developer, Riverside Development Company, and received three response letters from their <br /> attorney informing Staff that the developer is willing to assist the City in resolving this matter by providing a <br /> history of past discussions and to offer its opinion on any potential changes to the wall, but that they are not <br /> agreeable to assuming any financial liability associated with such changes. Their attorney also noted that the City <br /> cannot retain any of their client's financial securities outside of what is allowed by the Development Agreement, <br /> namely their one-year warranty and landscaping warranty. Staff therefore returned all securities outside of the <br /> warranty securities outlined within the Development Agreement. <br /> Staff also contacted the design engineer, Bogart-Pederson, to discuss their willingness to assist the City in resolving <br /> this matter. Bogart-Pederson said they informed City Staff that a wall constructed on their client's property would <br /> not be able to serve as a noise wall due to the low elevations on site, and that constructing a wall within Highway <br /> 47 right-of-way would not likely be economically feasible due to the need to relocate existing buried utilities and <br /> overhead power lines,but that Staff instructed.them to construct the wall per the plans,which was done. <br /> Bogart-Pederson said they would share their topo survey so the City could explore relocating the wall within <br /> Highway 47 right-of-way. <br /> Staff also contacted MnDOT and was informed that their preference would be for the wall to be constructed on <br /> private property but MnDOT did confirm that they would be willing to discuss construction of a wall in MnDOT <br /> right-of-way,though they do not have funds to pay for such work. Also,the City would need to execute a Limited <br /> Use Permit to define the responsibilities of the City related to maintenance and removal of the wall, if necessary in <br /> the future. <br /> 4n January 18, 2022, the Public Works Committee discussed this information, along with the estimated costs <br /> developed by Staff, and directed Staff to obtain the opinion of the new City Attorney as to the responsibilities of the <br /> developer and their engineer in this matter,to speak with the engineer to ask if they would at a minimum provide <br /> the required design services,to contact MnDOT to determine whether they would allow the wall to be relocated, <br /> reconstructed and/or extended within MnDOT right-of-way and whether any other funds may be available,to <br /> discuss available funding sources with the Finance Director, to review the site conditions, and to determine who the <br /> property owners are. <br /> On February 15,2022, the Public Works Committee received updates from Staff including responses received from <br /> the developer and their engineer, and estimated costs for the options previously discussed. After discussions, Staff <br /> noted that they would look at the grades to see if an opportunity might exist to cost-effectively add fill outside of <br /> MnDOT right-of-way while avoiding impacts to utilities, which could then be discussed in more detail at a future <br /> meeting. <br /> Since February, Staff has confirmed that the developer's engineer will provide their topographic survey data and <br /> utility as-built data to allow City Staff to further explore options for relocating, constructing, or extending sound <br /> walls within MnDQT'S Highway 47 right-of-way. Staff anticipates receiving this data very soon. However, <br /> additional topo survey will be needed to determine where a sound wall could effectively be constructed along the <br /> Highway 47 corridor, especially if the wall is to connected to the existing 6-foot tall sound wall approximately <br /> 900-feet to the north. Attached is the figure showing how long the sound wall would need to extend to the north of <br /> the Ramsey Villas North plat to connect to the existing sound wall. <br /> As previously discussed, Staff estimates construction costs for a similar sound wall to be approximately$210 per <br /> linear foot at today's construction costs. This would equate to a minimum construction cost of$50,000 to salvage <br /> and reinstall the existing wall within the Highway 47 right-of-way. To extend the wall past the north end of the <br />