My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:23:22 AM
Creation date
7/9/2024 2:22:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECTURAL NARRATIVE FOR TAKE 5 OIL—RAMSEY, MN <br /> CUP Submittal <br /> Codes and Standards: <br /> The following codes and standards will apply to this project. <br /> • 2018 International Building Code <br /> • 2020 MN Building Code <br /> • 2020 Accessibility Code <br /> • 2024 M N Energy Code <br /> • 2020 NEC Code <br /> Program <br /> Take 5 offers fast,friendly, simple oil changes while you stay in-your-car. You'll be in and out in 10 <br /> minutes. You'll get free water,tire check, and fluid top off. This facility will incorporate 3 drive-thru <br /> bays for your oil change. One of those bays will have a lift capability to do tire rotations. <br /> Take 5 is not an auto repair shop nor is it the intent to turn into that. <br /> Site Plan <br /> Phase 1 will include the Take 5 facility with a future restaurant development in Phase 2. Take 5 facility <br /> will coordinate with the future Aldi site to create a cohesive, convenient, and efficient site plan. <br /> Twelve (12) parking spots will be included as part of the Take 5 development with one (1) being an ADA <br /> stall. Parking along the Northstar mall is being provided as part of the purchase agreement. <br /> One trash enclosure 10'wide x 12' deep will be provided using rock-faced CMU block to enclose it. The <br /> CMU will match the color of the brick on the main Take 5 building. <br /> Plan <br /> The plan is a 30'wide x 62' long building (1,860 SF). The majority of the facility is (3) drive thru bays, but <br /> will also include a toilet, an office, and a storage room. <br /> Once a week an oil truck will fill the South side oil tanks and every other week an oil truck will remove <br /> the waste from the North side. These are typically done during off hours, so as to not impede traffic and <br /> business operations. <br /> Exterior Elevations <br /> The design of the exterior will include face brick, EIFs, a precast band, aluminum canopy, pre-finished <br /> metal coping, and signage. See architectural exterior elevations for colored elevation renderings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.