My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 07/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:23:22 AM
Creation date
7/9/2024 2:22:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at a future date,but likely this will only be required if additional development in the area occurs. This option is <br /> reflected in the attached Change Order No.2. <br /> Notification: <br /> Notification is not required. <br /> Observations/Alternatives: <br /> Time Frame: <br /> Staff estimates up to 10 minutes will be needed to present this case and respond to questions. <br /> Observations: <br /> Staff has reviewed the unit prices for the change order and feels the prices are reasonable based on current <br /> construction costs. If these improvements were to be constructed as a stand-alone project, Staff anticipates the <br /> costs would increase. <br /> Alternatives: <br /> Alternative#1 —Motion to adopt Resolution#24-185 approving Change Order#2 for Halls Dover Acres Street <br /> Reconstructions, Improvement Project#24-02. <br /> Alternative#2—Motion to deny Resolution#24-185, stop trunk watermain construction beyond the crossing at <br /> Nowthen Boulevard. <br /> Alternative#3—Motion of other. <br /> Funding Source: <br /> Payment for the work covered by Change Order#2 will be funded by Water Utility Funds. However, Staff is <br /> exploring whether the engineering consultant that provided the inaccurate record drawings to the City can be held <br /> liable for part or all of this change order given that the design for this project was based upon the information <br /> within the record drawings. Based on preliminary discussions with the City Attorney, this may be a viable option but <br /> staff must first confirm that an agreement did not exist that would absolve the engineering consultant of any liability for the <br /> inaccurate as-built plans. <br /> Change Order No.2 increases the construction costs by$81,775.05. <br /> Recommendation: <br /> Staff recommends Alternative#1. <br /> Action: <br /> Motion to adopt Resolution#24-185 approving Change Order#2 for Halls Dover Acres Street Reconstructions, <br /> Improvement Project#24-02. <br /> Attachments <br /> Res 24-185 <br /> Revised Watermain Route Exhibit <br /> IP 24-02 CO#2 <br /> Form Review <br /> Inbox Reviewed By Date <br /> Bruce Westby Bruce Westby 07/03/2024 12:59 PM <br /> Brian Hagen Brian Hagen 07/03/2024 01:04 PM <br /> Form Started By:Joe Feriancek Started On:07/02/2024 08:51 AM <br /> Final Approval Date:07/03/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.