My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/18/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 06/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:15 AM
Creation date
7/12/2024 7:46:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 1. <br />Public Works Committee <br />Meeting Date: 06/18/2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider Recommending City Council Ordering a Request for Proposals for Sewer and Water Connection to Fire <br />Station No.1 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council ordering a Request for Proposals for sewer <br />and water connections to Fire Station No.1. <br />Background: <br />In 2021, concurrent with overlaying the Fire Station No.1 parking lot, a 6-inch ductile iron water extension was <br />constructed. This extended a water service from the west side of the parking lot into the fire station's utility closet. <br />The 2-inch copper line from the on -site well remains in service, supplying water to the fire station. An existing <br />4-inch sanitary line runs parallel to the recently installed water service, and carries sewer to an existing tank <br />located just west of the parking lot. This overflows into the septic field located west of the parking lot in the green <br />space. <br />As part of the Lynwood Townhomes project, sanitary sewer and water stubs were extended to the west side of the <br />Fire Station property. The extensions were built with the 2 nd phase of Lynwood's construction, and complete in <br />2023. <br />This project proposes to complete the water and sewer extension to connect the water and sewer between the fire <br />station and the stubs placed as part of the Lynwood Townhomes project. This requires extending approximately <br />80 feet of sanitary sewer, and removing the existing septic tank and impacted drain field. As well as extending <br />approximately 95 feet of 6" ductile iron water service and relocating a fire hydrant and 6" gate valves. A sketch <br />of the proposed improvements is included in the attached draft Request for Proposal (RFP). <br />The water service is being constructed as 6-inches to accommodate the future fire station sprinkler system, <br />currently proposed as a 2024 improvement in the 2024 — 2033 Capital Improvement Program. <br />Staff proposes to take this to the June 25th City Council meeting to order the UP, and return proposals to the July <br />23rd City Council meeting to consider the award of a contract. This would allow the work to occur in August 2024. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Alternative # 1 — Motion recommending City Council ordering a Request for Proposals for sewer and water <br />connections to Fire Station No.1. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.